Energy Unite Integration Services Natural Gas Connection Form
  • Gas Connection Application

    Please complete a separate form for each property services is required.
  • PLEASE NOTE:

    This for is specifically related to the connection to the live gas network as well as  installation of gas metering equipment as per supplier requirement.

     

    If the property has an exisitng gas meter and you need to register your account kindly complete the following form: Customer Registration Gas Utilities


  •  - -
  • If your are the contractor please capture the tenant contact information in the below alternative detail fields

  •  - -
  •  - -
  •  - -
  • Browse Files
    Cancelof

  • Browse Files
    Cancelof
  •  / /
  • TERMS AND CONDITIONS:

    The gas installation team will make contact with your gas installer / building contractor to receive the Certificate of Compliance ( CoC) before they are allowed to commission the gas meter installation with live gas to the house.

    A minimum of 2 weeks are required before meter installation commences barring any unforseen or outstanding work to be completed related to the gas installation in the house.

     

  • Should be Empty: