• General Information

  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
  • Construction Period Start Date
     - -
  • Construction Period End Date
     - -
  • Limits of Insurance

    Part 2 of 10
  • Other Property to be insured

  • Wrap-Up Liability Required?
  • Contractor Information

    Part 3 of 10
  • Project Participants:      
    a) Owner:            
    b) General/Project Manager: 
    C) Prime Architect:      
    d) Engineering Firm:      
    e) Geotech Engineer:         

  • Does the Principal Contractor have a written safety program in place?
  • Does the Principal Contractor employ a designated job site risk manager?
  • Does the Principal Contractor obtain evidence of insurance from all sub-contractors
  • Does the Principal Contractor pre-qualify all sub-contractors?
  • Blank Field      

  • Construction Information

    Part 4 of 10
  • Construction Materials

  • Height of structure:      Storeys:      
    Feet or Metres:          
    Below Grade:     
    Above Grade:    
    Total Area:    

  • Is an Exterior Insulation and Finish Systems (EIFS) used?
  • If yes, does the EIFS assembly include expanded polystyrene insulation (EPS) or other combustible materials?
  • Protection Information

    Part 5 of 10
  • Fire Protection

  • Will the project be sprinklered?
  • Security Protection

  • Is the site fenced?  Yes. Height/Type:       
    Watchman service?           Hours/Rounds:        
    Alarm:            Alarm sounds to:     
    Video Surveillance:  Yes.  Type:      

  • Project Information

    Part 6 of 10
  • Adjacent Structures

  • Facing Direction (select all that apply)
  • Subsurface Operations: describe nature, duration, value and relationship to both the project and to adjacent structures.

  • Will there be blasting?
  • Will there be shoring?
  • Will there be pile driving?
  • Are there any demolition operations?
  • Geotechnical Data and Construction Data

  • Has a geotechnical report been completed?
  • Will the project be constructed in compliance with geotechnical recommendations?
  • Are wood forms to be used?
  • Will any portion of the project be occupied prior to completion?
  • Builder's Risk Information

    Part 7 of 10
  • Testing

  • Will testing be performed?
  • Will the project involve the installation of any used equipment?
  • Testing Period Start
     - -
  • Testing Period End
     - -
  • Flood Exposure

  • Site Risks

  • Off-Site Risks

  • Will any construction material, plant or equipment be stored off-site at non-owned locations?
  • Wrap Up Liability Information

    Part 8 of 10
  • Existing Structure

  • Does the project attach to or communicate with an existing structure?
  • Will the existing structure be occupied during the construction period?
  • Broker Information

    Part 9 of 10
  • Name of Brokerage: HUB International
    Brokerage Address: 9-1661 Portage Avenue, Winnipeg, MB
    Name of Broker Contact: Mark James
    Is this account NEW to your office? No

  • Declaration

    Part 10 of 10
  • I/We hereby declare that the statements and particulars contained in this application are true and that I/we have not suppressed or mis-stated any material facts and I/we agree that should a policy be issued then this application shall be the basis of the contract with Underwriters.

  • Todays Date
     - -
  • NOTE: Underwriters will rely upon complete responses given in this Application Form and any Supplementary Application Form in deciding whether or not to insure this risk and if so at what premium, terms and conditions. Underwriters regard every response to be material to their decisions. Failing to answer or answering any question below incorrectly could invalidate any policy of insurance written by Underwriters for this risk.

    We have a professional duty of confidentiality and are committed to holding personal information in strict confidence. The information provided to us will only be disclosed where required by law to do so or required to do so in conducting negotiations with third parties, such as insurance companies, on your behalf. We will further safeguard the security of such information in a manner appropriate to sensitivity of that information.

  • Additional Uploads

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: