Barefoot Beach Club Unit Alteration Form
  • Barefoot Beach Club Unit Alteration Form

  • Date work will begin*
     - -
  • Estimated Completion Date*
     - -
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Barefoot Beach Club Construction Policies & Procedures Agreement

  • Inspections & Building Maintenance 1. Exposed Infrastructure Inspections Any exposed plumbing, electrical, structural, or mechanical elements must be inspected before closing walls. 2. Required Upgrades Polybutylene Pipes: Must be replaced with code-approved PEX piping. Sanitary Pipes (Buildings 4 & 7-12): Must be replaced during renovations (Association will cover costs). Lanais: Waterproofing must use approved vendors & specified coatings (Tremco’s Vulkem 350NF). Floor Soundproofing: Proflex 90 must be used (except on the second floor).*
  • Should be Empty: