|
This phase involves the installation of Seed within {squareFootage141} SQFT of the designated area of the defined scope of work.
- Area will be final graded and prepped
- Starter fertilizer will be applied prior to the seed installation
- Irrigation zones will be checked (If Applicable)
- Irrigation Clock will be set to run 3-4x a day (If Applicable)
- This will be based on clock capabilities
NOTE: Madison Lawn & Landscape does NOT WARRANTY sod after installation. It is the responsibilty of the customer to maintain proper grow-in conditions.
This also includes:
- Tools | Equipment
- Parts | Materials
- Hauling | Delivery
- Labor
|