Key Bridge Rebuild Bidding Interest
Language
  • English (US)
  • Español
  • Key Bridge Rebuild Project - Bidder Interest Form

    Bid opportunities are updated regularly, please be sure to resubmit a bidder interest form to indicate your interest as scope packages are issued.
  • Kiewit will review all information received through the Bidder Interest Form and will issue bid invitations to firms whose services/materials align with the scopes being solicited.

     

  • CURRENT BID PACKAGES

  • CONTINUING BID PACKAGES

  • CURRENT BID PACKAGES

    Bid packages are scheduled to be released throughout the month of January/Early Feb.
  • PAST BID PACKAGES

  • (CLOSED) 48 Inch Pile Splicing
    (CLOSED) 48 Inch Pile Template
    (CLOSED) Anti-Climb Fencing and Mainspan Deck Railings
    (CLOSED) Aggregate / Backfill Materials
    (CLOSED) Aggregate Trucking Sub
    (CLOSED) Anchor Bolts
    (CLOSED) Anchor Boxes
    (CLOSED) Asphalt Sub
    (CLOSED) Barge Outfit Supplies
    (CLOSED) Bubble Curtain Materials
    (CLOSED) Bussing Sub
    (CLOSED) Civil Demolition Sub
    (CLOSED) Clearing and Grubbing
    (CLOSED) Column Formwork
    (CLOSED) Concrete Processing & Disposal
    (CLOSED) Concrete Supplies
    (CLOSED) Corrugated Metal Pipe
    (CLOSED) Crane Mats
    (CLOSED) Dewatering Supplies
    (CLOSED) Divers
    (CLOSED) Dolphin Repairs
    (CLOSED) Dock Road Bridge Demo
    (CLOSED) Dump Fees
    (CLOSED) Elevator Sub
    (CLOSED) Erosion and Sediment Control
    (CLOSED) Erosion & Sediment Control Supplies
    (CLOSED) Expansion Joints
    (CLOSED) Fencing & Temp Fence
    (CLOSED) Flatwork Sub
    (CLOSED) Fire Standpipe Sub
    (CLOSED) Fish Deterrent
    (CLOSED) Formwork Rentals
    (CLOSED) Frac Tanks
    (CLOSED) FRP Drainage Trough
    (CLOSED) FRP Timber Rub Rails and Inserts
    (CLOSED) Furnish Precast Slabs and Pile Collars
    (CLOSED) Furnish Rebar - North Land Approach
    (CLOSED) Furnish Rebar Cage Supports
    (CLOSED) Furnish Rebar Couplers
    (CLOSED) Geotextile Materials
    (CLOSED) Girder Demo Access
    (CLOSED) Girder Rigging
    (CLOSED) Grinding/Grooving Subcontract
    (CLOSED) Hourly Trucking
    (CLOSED) Inspect & Clean Drainage
    (CLOSED) Landscaping Sub
    (CLOSED) Lumber/Wood
    (CLOSED) Jack and Boring
    (CLOSED) Main Span- Exterior Tower Stay Platform
    (CLOSED) Main Span Hydraulic Rigging
    (CLOSED)Main Span Pier Caps - Falsework & Formwork
    (CLOSED) Main Span- Structural Steel
    (CLOSED) Maintenance of Traffic Supplies
    (CLOSED) Manhoist Equipment
    (CLOSED) Manhoist Sub
    (CLOSED) Manlift Rental
    (CLOSED) Marine Span - Structural Steel
    (CLOSED) Marine Survey
    (CLOSED) MOT Subcontractor
    (CLOSED) MSE Wall Sub
    (CLOSED) MSE Wall Supply
    (CLOSED) North Land Approach Sub
    (CLOSED) OSC - Survey Sub
    (CLOSED) OSC - Security Guards
    (CLOSED) OSR Concrete Pumping
    (CLOSED) Overhang Jacks
    (CLOSED) Overlay Sub
    (CLOSED) Painting Sub
    (CLOSED) Pavement Marking/Striping
    (CLOSED) Permanent Access Steel
    (CLOSED) Pier Access Platforms for Demolition
    (CLOSED) Pier Column Lifting Frame
    (CLOSED) Pier Concrete Column Rigging Components
    (CLOSED) Pier Protection Precast Concrete Structures
    (CLOSED) Pier Saddle Cap Platforms
    (CLOSED) Pile & Pile Caps
    (CLOSED) Pipe Lining
    (CLOSED) Pond Liner
    (CLOSED) Post Tensioning Strand Materials
    (CLOSED) Precast Drainage Trough
    (CLOSED) Precast Drg/Utility Structures
    (CLOSED) Precast Girder Bearings (Approaches)
    (CLOSED) Precast Girders
    (CLOSED) Pylon Reinforcing Steel Templates
    (CLOSED) RCP Materials
    (CLOSED) Ready-Mix/Concrete
    (CLOSED) Rebar Install
    (CLOSED) Roadway Guardrail
    (CLOSED) Saw Cutting
    (CLOSED) Settlement Monitoring Subs
    (CLOSED) Shear Stud Sub
    (CLOSEd) Slip Form Paving Sub
    (CLOSED) Sign Drilled Shaft Sub
    (CLOSED) Signage Subcontract
    (CLOSED) SOE - Temp Wire Wall
    (CLOSED) Stair Towers
    (CLOSED) Stairtowers - Marine Demolition
    (CLOSED) Stay-In-Place Metal Decking Sub
    (CLOSED) Steel Pile
    (CLOSED) Structural Steel Fabricated- Steel Diaphragm for Precast Panel
    (CLOSED) Temp Shoring
    (CLOSED) Temp Steel Falsework
    (CLOSED) Temp Traveler
    (CLOSED) Turbidity Curtains
    (CLOSED) Underdrain
    (CLOSED) Vessel Protection Miscellaneous Steel
    (CLOSED) Water Treat Systems & Storage
    (CLOSED) Waterline Piping
    (CLOSED) Weld Testing
    (CLOSED) Wheel Wash

    • (CLOSED) Land & Marine Boring (Bids Due: June 5, 2025)
    • (CLOSED) Pier 24 & 25 Precast Boxes (Bids Due: June 12, 2025)
    • (CLOSED) Trestle Access - Pile Bonnets (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - 36" Pipe Pile (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Cap Beams (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Stringer Packs (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Crane Mats (Bids Due June 13, 2025)
    • (CLOSED) Crew Boat Services (Bids Due: June 26, 2025)
    • (CLOSED) Tug Boat Services (Bids Due: June 26, 2025)
    • (CLOSED) Trestle Access - Bull Rail (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Handrail (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Mat Clips (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Walkway Lumber (Bids Due: July 2, 2025)
    • (CLOSED) Test Pile - Timber for Barge Lashing (Bids Due: July 7, 2025)
    • (CLOSED) Pylon Climbing Forms (Bids Due: July 11, 2025)
    • (CLOSED) Lock-Up Devices (Bids Due: July 11, 2025)
    • (CLOSED) Drone Fly & Videographer (Bids Due: July 14, 2025)
    • (CLOSED) Temporary Travelers (Bids Due: July 18, 2025)
    • (CLOSED) Pylon Boxes - Rebar (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Concrete (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Pile Lifters (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Tripping Frames (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Bubble Curtain (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Spreader Bar (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Concrete Pumping (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Formwork (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Steel Fabrication (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Dimensional Lumber (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Crane Mats (Bids Due: August 15, 2025)
    • (CLOSED) Concrete Washout Subcontract (Bids Due: August 22, 2025)
    • (CLOSED) Curing Supplies - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) HDPE Sheeting - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) Loop Coil Ties - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) Test Pile - Pin Piles (Bids Due: August 22, 2025)
    • (CLOSED) Pylon Boxes - Stair Towers (Bids Due: August 29, 2025)
    • (CLOSED) Pylon Boxes – Crack Injection (Bids Due: August 29, 2025)
    • (CLOSED) Tophats and Stainless Steel Embeds - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Misc Structural Steel - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Exterior Tub Walkway & Mechanical Platform Deck - Furnish and Install  (Bids Due: August 29, 2025)
    • (CLOSED) Stairtowers - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Perimeter Crowd Control Barrier - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Perimeter Crowd Control Barrier - Furnish & Install  (Bids Due: August 29, 2025)
    • (CLOSED) Overhang Brackets - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Misc Air System Components - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Misc Air System - Furnish & Install  (Bids Due: August 29, 2025)
    • (CLOSED) 1/8" HDPE Sheeting - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Pylon Boxes - Pile Top Bulkhead Fabrication (Bids Due: September 2, 2025)
    • (CLOSED) Mud Mat, Invert Slab, and Walls - Furnish and Install (Bids Due: September 3, 2025)
    • (CLOSED) Finish Mud Slab (Bids Due: September 5, 2025)
    • (CLOSED) Pile Driving - Pile Templates (Bids Due: September 12, 2025)
    • (CLOSED) Trestle Access - Clear & Grub (Bid Due: (October 9, 2025)
    • (CLOSED) Furnish and Install - Hydraulic System - Pile Template (Bid Due: (October 10, 2025)
    • (CLOSED) Furnish Temporary Steel Piles (Bid Due: October 10, 2025)
    • (CLOSED) Pile Driving - Ledger Beams and Bonnets (Bid Due: October 13, 2025)
    • (CLOSED) Temporary Chain Link Gates (Bids Due: October 17, 2025)
    • (CLOSED) Pile Driving-Sea Fastening Materials-Steel Fabrication (Bid Due: October 22, 2025)
    • (CLOSED) Temporary Chain Link Fencing (Bids Due: October 23, 2025)
    • (CLOSED) Vessel Protection Nose Piles Pier 24 and 25 (Bid Due: October 24, 2025)
    • (CLOSED) Vessel Protection Nose Piles Pier 24 and 25 - Concrete Supply (Bid Due: October 24, 2025)
    • (CLOSED) Vessel Protection Nose Piles - F&I Rebar Cages (Bid Due: October 24, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Sand Bedding Supply (Bid Due: October 24, 2025)
    • (CLOSED) Erosion and Sediment Control (Bid Due: October 30, 2025)
    • (CLOSED) Furnish Precast Slabs and Pile Collars at Pier 25 and 25 (Bid Due: October 30, 2025)
    • (CLOSED) Vessel Protection - Precast Concrete Structures and Pile Collars (Bid Due: October 31, 2025)
    • (CLOSED) U-Turn Civil Work (Bid Due: November 4, 2025)
    • (CLOSED) U-Turn MOT Services (Bids Due: November 4, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Spot Hire Tugboat Service (Bid Due: November 7, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Tug Boat Services (Bid Due: November 7, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Crew Boat Service (Bid Due: November 7, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Marine Mammal Monitoring (Bid Due: November 10, 2025)
    • (CLOSED) Vessel Protection Nose Piles - Hydrophone Monitoring (Bid Due: November 10, 2025)
    • (CLOSED) Vessel Protection Nose Pile - Fish Kill Monitoring (Bid Due: November 10, 2025)
  • ANTICIPATED FUTURE BID PACKAGES (Q4 2025):

    Notifications will be issued once the following bid packages become available. Please submit the form to indicate interest upon the release of each package.

    • Batch & Deliver Ready-Mix Concrete
    • Bridge Lock-Up Devices (Fabricate & Deliver)
    • Cable Stay Anchor Boxes (Fabricate & Deliver)
    • Cable Stay Materials and Tech Support/Testing (Furnish)
    • Corrugated Metal Pipe - For Precast Footing & Pier Protection
    • Electrical & ITS Subcontract
    • Expansion Joints (Fabricate & Deliver)
    • Furnish Pylon Climbing Forms (Furnish)
    • Geotechnical Borings
    • Latex Modified Concrete (LMC) Overlay (Install)
    • Main Span Structural Steel - Girders, Baffles, Fairings (Fabricate & Deliver)
    • Marine Span Structural Steel (Fabricate & Deliver)
    • Permanent Pylon Access Steel (Fabricate)
    • Precast Concrete Deck Panels (Fabricate & Deliver)
    • Precast Footing/ Fender Shell Casting (Fabricate & Deliver)
    • Precast Girder Bearings - Elastomeric & Sole Plates (Fabricate & Deliver)
    • Precast Girders - 87" Bulb Tee (Fabricate & Deliver)
    • Precast Pile Collars & Pile Collar Seals (Furnish)
    • Precast Virginia Troughs (Fabricate & Deliver)
    • Pylon Elevators (Furnish & Install)
    • Rebar (Furnish)
    • Rebar (Install)
    • Steel Diaphragms for Precast Girders (Fabricate & Deliver)
    • Steel Pipe Pile, Shear Rings, and Pile Coating (Fabricate & Deliver)
    • Structural Steel Bearings - Disc & Main Span (Fabricate & Deliver)
    • TVRA Steel Cladding (Fabricate & Deliver)

     

    ANTICIPATED FUTURE BID PACKAGES (Q1 2026):

    Notifications will be issued once the following bid packages become available. Please submit the form to indicate interest upon the release of each package.

    • Aggregates / Backfill Materials (Furnish & Deliver)
    • Anchor Bolts (Furnish)
    • Asphalt Paving
    • Barrier Wall for MOT (Furnish)
    • Bridge Deck Grinding/Grooving
    • Bridge Drainage - Scuppers, Downspouts, and Hangers (Fabricate & Deliver)
    • Bubble Curtain Materials
    • Bussing
    • Clear and Grub
    • Concrete Formwork Rentals
    • Concrete Pumping
    • Dewatering Supplies - Weirs, Pumps, treatment plant rentals
    • Divers
    • Drainage (Inspect & Clean)
    • Equipment - Flat Bed Trailers
    • Erosion and Sediment Control
    • Fall Protection Supplies (Furnish)
    • Fencing - Permanent Chain & Climb Deterrent
    • Fender Pile & Hardware (Furnish)
    • Flatwork
    • Guardrail Installation
    • Hourly Trucking
    • Hydrophone Monitoring
    • Landscaping
    • Lumber/Wood (Furnish & Deliver)
    • Maintenance of Traffic Supplies - Signs Type III, VMS
    • Mammal Monitoring
    • Manhoist Sub
    • Marine Equipment - Menck Tech & Freight
    • Marine Transportation - Long Haul Tugs
    • Miscellaneous Metals Subcontract - Permanent Handrail (Furnish & Install)
    • MSE Wall (Furnish)
    • MSE Wall (Install)
    • Onsite Crew Boat
    • Onsite Security
    • Onsite Tug Boat
    • Overhang Jacks (Furnish)
    • Overhead Signage (Furnish & Install)
    • Painting Subcontract
    • Pavement Marking/Striping
    • Pile Testing
    • Post Tension - 2" Bolt, Washer, Nut (Furnish)
    • Post Tension Strand Materials - Duct, Strand, Grout (Furnish)
    • Post Tensioning Inspection - Pylon
    • Precast Box Air System (Furnish)
    • Precast Drg/Utility Structures (Furnish)
    • Precast Panel Blocking
    • RCP - 18", 24", and 36" (Furnish)
    • Shear Studs (Furnish & Install)
    • Shoring/Stairs - Stair Towers and Pylon Access Gangways
    • SIP Metal Decking (Install)
    • Slipform Barrier
    • Stay-In-Place Metal Decking (Furnish)
    • Street Sweeping
    • Supply & Maintain Chemical Toilets
    • Supply Concrete Testing Equipment/Supplies - Stitch Pour Maturity Meters
    • Supply Geotextile Materials
    • Surveying
    • Temp Fence (Furnish & Install)
    • Temp Shoring - Trench Boxes (Furnish)
    • Temp Wire Wall (Furnish)
    • Temporary Deck Panels (Furnish)
    • Tower Crane Assembly / Disassembly
    • Trash Removal
    • Underdrain (Furnish)
  • Should be Empty: