Key Bridge Rebuild Bidding Interest Logo
Language
  • English (US)
  • Español
  • Key Bridge Rebuild Project - Bidder Interest Form

    Bid opportunities are updated regularly, please be sure to resubmit a bidder interest form to indicate your interest as scope packages are issued.
  • CURRENT BID PACKAGES (Packages are due 10 Business Days from released date)

  • UPCOMING BID PACKAGES

  • PAST BID PACKAGES

    • (CLOSED) Land & Marine Boring (Bids Due: June 5, 2025)
    • (CLOSED) Pier 24 & 25 Precast Boxes (Bids Due: June 12, 2025)
    • (CLOSED) Trestle Access - Pile Bonnets (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - 36" Pipe Pile (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Cap Beams (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Stringer Packs (Bids Due June 13, 2025)
    • (CLOSED) Trestle Access - Crane Mats (Bids Due June 13, 2025)
    • (CLOSED) Crew Boat Services (Bids Due: June 26, 2025)
    • (CLOSED) Tug Boat Services (Bids Due: June 26, 2025)
    • (CLOSED) Trestle Access - Bull Rail (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Handrail (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Mat Clips (Bids Due: July 2, 2025)
    • (CLOSED) Trestle Access - Walkway Lumber (Bids Due: July 2, 2025)
    • (CLOSED) Test Pile - Timber for Barge Lashing (Bids Due: July 7, 2025)
    • (CLOSED) Pylon Climbing Forms (Bids Due: July 11, 2025)
    • (CLOSED) Lock-Up Devices (Bids Due: July 11, 2025)
    • (CLOSED) Drone Fly & Videographer (Bids Due: July 14, 2025)
    • (CLOSED) Temporary Travelers (Bids Due: July 18, 2025)
    • (CLOSED) Pylon Boxes - Rebar (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Concrete (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Pile Lifters (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Tripping Frames (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Bubble Curtain (Bids Due: August 15, 2025)
    • (CLOSED) Pile Driving - Spreader Bar (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Concrete Pumping (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Formwork (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Steel Fabrication (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Dimensional Lumber (Bids Due: August 15, 2025)
    • (CLOSED) Pylon Boxes - Crane Mats (Bids Due: August 15, 2025)
    • (CLOSED) Concrete Washout Subcontract (Bids Due: August 22, 2025)
    • (CLOSED) Curing Supplies - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) HDPE Sheeting - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) Loop Coil Ties - Furnish (Bids Due: August 22, 2025)
    • (CLOSED) Test Pile - Pin Piles (Bids Due: August 22, 2025)
    • (CLOSED) Pylon Boxes - Stair Towers (Bids Due: August 29, 2025)
    • (CLOSED) Pylon Boxes – Crack Injection (Bids Due: August 29, 2025)
    • (CLOSED) Tophats and Stainless Steel Embeds - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Misc Structural Steel - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Exterior Tub Walkway & Mechanical Platform Deck - Furnish and Install  (Bids Due: August 29, 2025)
    • (CLOSED) Stairtowers - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Perimeter Crowd Control Barrier - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Perimeter Crowd Control Barrier - Furnish & Install  (Bids Due: August 29, 2025)
    • (CLOSED) Overhang Brackets - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Misc Air System Components - Furnish (Bids Due: August 29, 2025)
    • (CLOSED) Misc Air System - Furnish & Install  (Bids Due: August 29, 2025)
    • (CLOSED) 1/8" HDPE Sheeting - Furnish & Install (Bids Due: August 29, 2025)
    • (CLOSED) Pylon Boxes - Pile Top Bulkhead Fabrication (Bids Due: September 2, 2025)
    • (CLOSED) Mud Mat, Invert Slab, and Walls - Furnish and Install (Bids Due: September 3, 2025)
    • (CLOSED) Finish Mud Slab (Bids Due: September 5, 2025)
  • ANTICIPATED FUTURE BID PACKAGES (Q4 2025):

    Notifications will be issued once the following bid packages become available. Please submit the form to indicate interest upon the release of each package.

    • Batch & Deliver Ready-Mix Concrete
    • Bridge Lock-Up Devices (Fabricate & Deliver)
    • Cable Stay Anchor Boxes (Fabricate & Deliver)
    • Cable Stay Materials and Tech Support/Testing (Furnish)
    • Corrugated Metal Pipe - For Precast Footing & Pier Protection
    • Electrical & ITS Subcontract
    • Expansion Joints (Fabricate & Deliver)
    • Furnish Pylon Climbing Forms (Furnish)
    • Geotechnical Borings
    • Latex Modified Concrete (LMC) Overlay (Install)
    • Main Span Structural Steel - Girders, Baffles, Fairings (Fabricate & Deliver)
    • Marine Span Structural Steel (Fabricate & Deliver)
    • Permanent Pylon Access Steel (Fabricate)
    • Precast Concrete Deck Panels (Fabricate & Deliver)
    • Precast Footing/ Fender Shell Casting (Fabricate & Deliver)
    • Precast Girder Bearings - Elastomeric & Sole Plates (Fabricate & Deliver)
    • Precast Girders - 87" Bulb Tee (Fabricate & Deliver)
    • Precast Pile Collars & Pile Collar Seals (Furnish)
    • Precast Virginia Troughs (Fabricate & Deliver)
    • Pylon Elevators (Furnish & Install)
    • Rebar (Furnish)
    • Rebar (Install)
    • Steel Diaphragms for Precast Girders (Fabricate & Deliver)
    • Steel Pipe Pile, Shear Rings, and Pile Coating (Fabricate & Deliver)
    • Structural Steel Bearings - Disc & Main Span (Fabricate & Deliver)
    • TVRA Steel Cladding (Fabricate & Deliver)

     

    ANTICIPATED FUTURE BID PACKAGES (Q1 2026):

    Notifications will be issued once the following bid packages become available. Please submit the form to indicate interest upon the release of each package.

    • Aggregates / Backfill Materials (Furnish & Deliver)
    • Anchor Bolts (Furnish)
    • Asphalt Paving
    • Barrier Wall for MOT (Furnish)
    • Bridge Deck Grinding/Grooving
    • Bridge Drainage - Scuppers, Downspouts, and Hangers (Fabricate & Deliver)
    • Bubble Curtain Materials
    • Bussing
    • Clear and Grub
    • Concrete Formwork Rentals
    • Concrete Pumping
    • Dewatering Supplies - Weirs, Pumps, treatment plant rentals
    • Divers
    • Drainage (Inspect & Clean)
    • Equipment - Flat Bed Trailers
    • Erosion and Sediment Control
    • Fall Protection Supplies (Furnish)
    • Fencing - Permanent Chain & Climb Deterrent
    • Fender Pile & Hardware (Furnish)
    • Flatwork
    • Guardrail Installation
    • Hourly Trucking
    • Hydrophone Monitoring
    • Landscaping
    • Lumber/Wood (Furnish & Deliver)
    • Maintenance of Traffic Supplies - Signs Type III, VMS
    • Mammal Monitoring
    • Manhoist Sub
    • Marine Equipment - Menck Tech & Freight
    • Marine Transportation - Long Haul Tugs
    • Miscellaneous Metals Subcontract - Permanent Handrail (Furnish & Install)
    • MSE Wall (Furnish)
    • MSE Wall (Install)
    • Onsite Crew Boat
    • Onsite Security
    • Onsite Tug Boat
    • Overhang Jacks (Furnish)
    • Overhead Signage (Furnish & Install)
    • Painting Subcontract
    • Pavement Marking/Striping
    • Pile Testing
    • Post Tension - 2" Bolt, Washer, Nut (Furnish)
    • Post Tension Strand Materials - Duct, Strand, Grout (Furnish)
    • Post Tensioning Inspection - Pylon
    • Precast Box Air System (Furnish)
    • Precast Drg/Utility Structures (Furnish)
    • Precast Panel Blocking
    • RCP - 18", 24", and 36" (Furnish)
    • Shear Studs (Furnish & Install)
    • Shoring/Stairs - Stair Towers and Pylon Access Gangways
    • SIP Metal Decking (Install)
    • Slipform Barrier
    • Stay-In-Place Metal Decking (Furnish)
    • Street Sweeping
    • Supply & Maintain Chemical Toilets
    • Supply Concrete Testing Equipment/Supplies - Stitch Pour Maturity Meters
    • Supply Geotextile Materials
    • Surveying
    • Temp Fence (Furnish & Install)
    • Temp Shoring - Trench Boxes (Furnish)
    • Temp Wire Wall (Furnish)
    • Temporary Deck Panels (Furnish)
    • Tower Crane Assembly / Disassembly
    • Trash Removal
    • Underdrain (Furnish)
  • Should be Empty: