📆 Delivery Timeline
- Preview: 5–10 business days. (depending on the project)
- Final set: 20–30 days after approval. (depending on the project)
- Revisions: 2 included (extra revisions available with fee)
- Engineer’s stamp, full electrical, and full plumbing designs are not included
⚡ Scope of Services
Our work focuses on architectural drawings and visual design concepts. The following are not included:
- ❌ Structural calculations or engineer stamp (load diagrams, calculations)
- ❌ Full electrical design
- ❌ Full plumbing system design (we only indicate fixture points)
- ❌ Site surveys, soil tests, or topographic maps
- ❌ In-person site visits or inspections
- ❌ Material selection or interior décor shopping list
💻 Meetings & Support
Our team works remotely from Brazil, and all projects are managed digitally. We provide full online support, frequent updates, and video meetings as needed. We’ve proudly supported dozens of builders and investors across the U.S.
🤝 Why Choose DA·RA Studio
✔ Code-compliant documentation
✔ U.S. building standards
✔ Fast turnaround & responsive team
✔ Trusted by builders, developers & architects