is_prefilled
Name
*
Name
*
Company
Phone Number
*
State/Province
*
Email Address
*
City/Town
*
Location Address
*
ZIP/Postal Code
*
Project Type
*
Please Select
- Select -
Residential
Commercial
Farm/Agriculture
Municipality
Industrial
Coupon Code
How did you hear about us?
*
\n
Back
Next
Save
Mount Type
Do you have a preference on the mounting and location of solar panels? (Check All That Apply)
*
Do you have a preference on the mounting and location of solar panels? (Check All That Apply)
Does your property belong to a Homeowner's Association?
Yes
No
Does your HOA have restrictions on installing solar panels?
Yes
No
I need to check
Shading Issues
Do you have any Shading issues such as trees or buildings from 9am to 4pm?
Yes
No
Maybe
Have my solar expert perform a shading study on-site or using LiDAIR
Trees
Are you willing to trim or remove trees that you own if required?
*
Yes
No
Maybe. Up for conversation
N/A
If other, please specify.
Project Timeline
What is the timeline of your project?
*
1 month or less
More than 1 month but less than 6 months
More than 6 months but within the year
Next year
Other
Back
Next
Save
Project Type
Project Type Services
Project Type Services
What type of Solar project is this for?
*
Residential
Government and Municipal
Commercial (For Profit)
401C (Non-Profit)
Farm
Annual Savings
How much money would you like to save annually with Solar?
*
80-100%
55-75%
50%
Other
Project Financing
Will you pay cash or need financing? We offer 0% to 6.99%.
*
I will pay cash, not using ECG Financing Option
I will secure my own financing
I would like to explore ECG Financing Options
If you selected the option to explore ECG Financing Options, please complete the steps below:
In order to offer the best ECG Solar loan option for you, we need to know what has the highest priority for you. Please place a number below the following options from 1 to 3 with 1 being the highest priority and 3 being less priority.
Interest Rate (0.99% to 6.99%)
*
Term (duration of loan 5Y to 25Y)
*
Lowest Monthly Payment
*
Third-Party Extended Warranty Program
Would you like to include an optional 30-year third-party insurance (extended warranty) program with your quote? This program goes beyond standard manufacturer warranties, covering additional situations and extending your coverage to 30 years.
*
Yes
No
Learn More About The Program Below:
Back
Next
Save
Electric Utility Provider
Please indicate which is your electric utility provider. (IE, Alliant, Mid-Am...)
*
Utility Bills (fill in kwH and cost or attach data at end of survey line 20)
Why do we need this information? To correctly size your PV/battery system, we need to see how much energy you are using on a yearly basis and see how much you are paying for that energy to provide accurate payback calculations (ROI).
January Kilowatt hours (KWH)
January Cost ($)
February Kilowatt hours (KWH)
February Cost ($)
March Kilowatt hours (KWH)
March Cost ($)
April Kilowatt hours (KWH)
April Cost ($)
May Kilowatt hours (KWH)
May Cost ($)
June Kilowatt hours (KWH)
June Cost ($)
July Kilowatt hours (KWH)
July Cost ($)
August Kilowatt hours (KWH)
August Cost ($)
September Kilowatt hours (KWH)
September Cost ($)
October Kilowatt hours (KWH)
October Cost ($)
November Kilowatt hours (KWH)
November Cost ($)
December Kilowatt hours (KWH)
December Cost ($)
Rate Code
(fill in kwH and cost or attach data at end of survey line 20)
What is your rate code? This is found on your utility bill. (R400, 401, 01, etc.)
Back
Next
Save
General Questions
(fill in kwH and cost or attach data at end of survey line 20)
Age of Roof? Roof Type? (Example: asphalt, metal panel, slate, etc) Roof Pitch? (4:12 or expressed in angle 23d)
Age of Home?
Do you have a preference on what roof surfaces to install solar on? (North, NE, NW sides are not productivity viable)
Preferred location for a Ground Mount? (Feel free to provide Google Site image - upload on step 7)
Is there a known path way to get from attic to load center/meter location (chase, wall opening, conduit, pipe, etc...)
Is there attic access? If so, location?
Do you know the spacing of the trusses? (typically 24" o.c.) Framing type? (Rafters, trusses, heavy timber, etc.)
Do you have internet and a router wired or wireless on site? Would it be possible to hard wire our equipment to your router?
Any special provisions we need to account for your project?
Any existing solar configurations on your home? If so, please provide any description on the existing equipment and upload in Step 7.
Solar Panels
Battery Storage
Generator
EV Charger
None
Back
Next
Save
Electrical Equipment
(fill in kwH and cost or attach data at end of survey line 20)
Electric meter location? (I.E. Southside of garage, NW corner of house, etc.)
*
Attach images of your meter location (Take image at least 10' back from wall/meter)
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Load center (circuit breaker panel) location & size? (SW corner of basement, in middle of basement, etc.)
*
Attach images of your load center (Take image at least 10' back from wall/breaker box)
Browse Files
Drag and drop files here
Choose a file
Cancel
of
How many amps is your electrical service? (Typically on decal on inside of door of load center or stamped on main breaker)
100 Amps (Typical for Homes built before 1970)
200 Amps (Typical for Homes built after 1970)
300 Amps
Unknown
Other
Size of main breaker in load center (typically stamped on main breaker)
Quality of Equipment
What quality of equipment are you interested in?
*
Premium Performance Tier 1 Modules - Best Performance, Superior Warranty, American made, (cost slightly more than Standard Tier 1 equipment)
Standard Performance Tier 1 Modules - Good Performance, Typical Warranty, Chinese Made, (on par with our competitors offering)
Tier 1:B Grade, Tier 2 or 3 Modules - Fair Performance, Poor Warranty, Marginal Quality, (includes startup companies, but lowest cost)
If other, please specify. (NOTE! We do not install customer-provided equipment)
Back
Next
Save
Other Interests
Do you have any interest in the following products and services we offer? (Financing available for all options.)
Do you have any interest in the following products and services we offer? (Financing available for all options.)
Additional Usage
Do you anticipate any electrical load changes by adding or reducing from historical usage?
*
Adding Electric Vehicle (typical DOT calculations is average 4310 Kwh per year or around 17,240 miles per year*)
Adding Hot Tub/Pool
Water Heater (switching from gas)
Adding Furnace, Space Heaters, Dryers, Applainces
Adding lights, pond pumps, pools, water heaters for animals, etc...
N/A
Other (list below)
How and when we can contact you?
Best way to contact you? (email, text, phone)
Best time to contact you by phone?
Best time to schedule a site assessment and in-home consultation?
Additional Comments
Any other comments or information we need to know?
Add Supporting Documents
The maximum file size is 25MB, and you can upload up to 6 files. Additional documents can be sent to info@ecgllp.com with your first and last name in the email subject line.
Attach a File
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Phone Number Verification
*
Save
Submit
Should be Empty: