Pre-Delivery Inspection
Location
*
Ohio
Indy
quality@evolvetransporters.com
example@example.com
Transporter Number
*
Please Select
EV4109
EV4112
EV4113
EV4114
EV4115
EV4116
EV4117
EV4118
EV4119
EV4120
EV4121
EV4122
EV4123
EV4124
EV4125
EV5005
Client Name
*
Inspection Date
*
-
Month
-
Day
Year
Date
Wheels And Tires C.C. - 766
*
Pass
Needs Attention
N/A
Tire pressure within spec.
Lug nut torque within spec.
Axel lube level is acceptable.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Chassis C.C. - 767
*
Pass
Needs Attention
N/A
Chassis is coated properly with no bare metal or inconsistent coating.
Chassis is structurally sound and complete.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Chassis Electrical C.C. - 767
*
Pass
Needs Attention
N/A
All connections in junction boxes are tight.
Junction box covers are installed properly and tight.
Wires are fastened properly and not hanging low.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Suspension C.C. - 768
*
Pass
Needs Attention
N/A
Air lines and related components have no leaks.
Air suspension operates properly through all positions.
Control arm pivot bolt within torque spec.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Brakes C.C. - 769
*
Pass
Needs Attention
N/A
Air lines and components have no leaks.
Air brakes operate properly.
System has no codes or faults.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Landing Gear C.C. - 766
*
Pass
Needs Attention
N/A
System has no leaks, and all fitting torque checked.
System operates properly with raise and lower.
Hydraulic fluid in both positions is within spec.
Rear landing gears extend and retract properly.
Auto leveling system functions properly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Raised Roof
*
Pass
Needs Attention
N/A
System operates properly in/out and engages limits.
The expandable closes tightly to wall structure.
All trim and Seals are installed Uniformly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Man Doors C.C. - 773
*
Pass
Needs Attention
N/A
Man doors open/close and latch properly.
Mating surfaces and weather seal are tight.
Door keepers catch and keep door open.
Keys are supplied and all locks work properly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Exterior Structure C.C. - 774
*
Pass
Needs Attention
N/A
Roof is clean secured and sealed properly.
Observation deck related items are tight and sealed properly.
Skins are flush joined tightly and damage/dent free.
Fenderettes look straight/symmetrical and are sealed properly.
Extrusion looks straight with no damage and is sealed.
Wings are securely fastened and dent free.
Generator housing upper/lower doors open/shut and latch properly.
Generator house bottom panel is attached securely and does not rattle.
All glad hands seal and lock into place properly.
All box doors open/close and latch/lock properly.
Inside of boxes are clean, coated and finished.
liftgate header and all liftgate related areas are caulked and sealed.
Weather stripping is installed correct and functional on all boxes.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Generator Housing C.C. - 487
*
Pass
Needs Attention
N/A
All generator fluids are topped off.
Generator starts and runs/shuts down with remote and hand controls.
Generator runs properly and sounds healthy.
Generator has no leaks.
Fuel tank is mounted securely.
Fuel lines are tight and leak free.
All battery connections are tight.
All batteries test good with a load tester.
Fuel transfer pump is mounted correct and tight.
Fuel transfer pump worked correctly.
All wire penetrations are tight and sealed.
Land line receptacle is mounted correctly and works properly.
All outlets/controls/switches work properly.
All covers for outlets/switches and boxes are tight.
220v receptacles are mounted correctly and work.
Telescopic boom raises/lowers and holds up position properly.
Fire extinguishers are charged and mounted properly.
All fire suppression lines are connected and tight.
Generator housing fan is operational and turn on/off with the PLC Icon.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Liftgate C.C. - 565
*
Pass
Needs Attention
N/A
Liftgate extends and returns properly with pendant station and hand controls.
Liftgate goes up and down properly with pendant station and hand controls.
Emergency stop has been tested and works properly.
Liftgate is quiet and has no excessive noise.
Liftgate limits stop liftgate at acceptable locations.
Liftgate is "even" while extended at ground level and in "almost" closed position.
Liftgate secondary chain pins move freely and lock.
All liftgate chains have uniform sleeves and heat shrink.
Liftgate closes into header securely.
Stanchions/safety lines are tight and operate correctly.
Ramp opens/closes and locks into place correctly.
Liftgate controls and wiring are installed uniform and neatly.
Liftgate manual override tested and works properly.
Liftgate channels/screws are lubricated properly.
Pendant station bypass switch works properly.
Verify proper rotary switch belt alignment.
Verify proper rotary switch belt tension.
Verify that all u-joints have been greased.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Exterior Lighting and Electrical C.C. - 615
*
Pass
Needs Attention
N/A
All lights are mounted properly.
All clearance/marker lights work properly.
All flood lights work properly.
Brake lights work properly.
Turn indicators work properly.
Header lights work properly.
Load Lights work Properly.
All 110v outlets are mounted/work properly with covers installed tight.
All 220v outlets are mounted/work properly with covers installed tight.
License plate light works properly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Overhead Door C.C. - 779
*
Pass
Needs Attention
N/A
Door opens smooth and stays in upright position.
Door shuts smooth and does not slam shut.
Door latches properly.
Handle lock engages and stays engaged until unlocked.
All zipper covers or banners are uniform and function properly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Lounge Interior C.C. - 240
*
Pass
Needs Attention
N/A
All 110v outlets work.
All 110v outlets and covers are mounted properly and tight.
All USB receptacles work and are mounted properly.
All CAT6 receptacles work and are mounted properly.
All HDMI receptacles work and are mounted properly.
Screens/ TV's/monitors work and are mounted properly.
Celling panels are mounted flush and proper without any defects.
Wall panels are installed flush and proper without defects.
Flooring is installed flush and proper without defects.
Lighting works and is installed flush and proper without defects.
Vents/speakers/covers are installed flush and tight.
Stairs are finished, they fit proper and are stable.
All cabinet laminate is installed properly and is damage free.
Cabinet doors open/close correctly and have proper alignment.
Cabinet latches work properly and pull door tight.
Cabinet shelves are installed properly.
Cabinet drawers open and close properly.
All tool box drawers open and close properly.
Counter and desktops are securely fastened and defect free.
All chairs raise/lower and recline.
All chair leashes are installed and snap in place properly.
All caulking looks uniform and professional.
Check inside of all cabinets and drawers for conceal stickers.
Man door opens/shuts and locks properly.
Check all doors and drawers for bumpers and a quiet shut.
Generator DB test is less than 65DB.
All upholstery is uniform and defect free.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Upper deck Interior C.C. - 527
*
Pass
Needs Attention
N/A
All 110v outlets work.
All 110v outlets and covers are mounted properly and tight.
All USB receptacles work and are mounted properly.
All CAT6 receptacles work and are mounted properly.
All HDMI receptacles work and are mounted properly.
Screens/ TV's/monitors work and are mounted properly.
Celling panels are mounted flush and proper without any defects.
Wall panels are installed flush and proper without defects.
Flooring/decking is installed flush and proper without defects.
Lighting works and is installed flush and proper without defects.
Vents/speakers/covers are installed flush and tight.
Ladder mounts/pins/latches into place properly and is sturdy.
All cabinet laminate is installed properly and is damage free.
Cabinet doors open/close correctly and have proper alignment.
Cabinet latches work properly and pull door tight.
Cabinet shelves are installed properly.
Cabinet drawers open and close properly.
All toolbox drawers open and close properly.
Counter/desktops are securely fastened and defect free.
All caulking looks uniform and professional.
All lower Troff's and upper 45* covers are fastened, straight and tight.
All upholstery is uniform and defect free.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Lower deck Interior C.C. - 528
*
Pass
Needs Attention
N/A
All 110v outlets work.
All 110v outlets and covers are mounted properly and tight.
All USB receptacles work and are mounted properly.
All CAT6 receptacles work and are mounted properly.
All HDMI receptacles work and are mounted properly.
Screens/ TV's/monitors work and are mounted properly.
Celling panels are mounted flush and proper without any defects.
Wall panels are installed flush and proper without defects.
Flooring is installed flush and proper without defects.
Lighting works and is installed flush and proper without defects.
Vents/speakers/covers are installed flush and tight.
All cabinet laminate is installed properly and is damage free.
Cabinet doors open/close correctly and have proper alignment.
Cabinet latches work properly and pull door tight.
Cabinet shelves are installed properly.
Cabinet drawers open and close properly.
All toolbox drawers open and close properly.
Counter/desktops are securely fastened and defect free.
All caulking looks uniform and professional.
Ancra/E-track is installed properly looks straight and is fully functional.
Refrigerator/freezer turns on and is cold.
Check microwave and make sure it powers up.
Check all doors and drawers for bumpers and a quiet shut.
Check inside of all cabinets and drawers for conceal stickers.
All upholstery is uniform and defect free.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Pocket Doors C.C. - 787
*
Pass
Needs Attention
N/A
Doors open/close uniformly and with ease.
Soft close works properly and doors do not slam closed.
All locks and latches work properly.
Gaps are uniform and not excessive.
All hardware and accessories are installed tight and correct.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Rom Doors C.C. -
*
Pass
Needs Attention
N/A
ROM doors open/shut and land in the catch properly.
ROM doors look flush and level in open and closed position.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
I.T. & Media Hub C.C. - 365
*
Pass
Needs Attention
N/A
All 110v outlets work.
All 110v outlets are mounted properly with tight covers.
All USB receptacles work and are mounted properly.
All CAT6 receptacles work and are mounted properly.
All HDMI receptacles work and are mounted properly.
All electronics power up and are operational.
All rack mount fasteners and washers are uniform and tight.
Rack mounted light turns on and off.
Cables and wires in back are uniform and routed nicely.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Lounge and lower deck PLC Interface C.C. - 357
*
Pass
Needs Attention
N/A
Home screen is lit and displays logo and all the below needed areas for selection.
LOUNGE- All functions in this selection operate corresponding components.
LOWER DECK- All functions in this selection operate corresponding components.
UPPER DECK- All functions in this selection operate corresponding components.
EXTERIOR- All functions in this selection operate corresponding components.
OPERATION- All functions in this selection operate corresponding components.
MASTER OFF- Shuts off all PLC related components currently activated.
Utility function displays files for alteration (do not alter anything).
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Manual Control and Switch Panel C.C. - 366
*
Pass
Needs Attention
N/A
All manual switches turn components on/off.
All interface and thermostat functions control related components.
All switches/interfaces and thermostats are clearly labeled.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Manual Control and Switch Panel Electrical C.C. - 366
*
Pass
Needs Attention
N/A
All wiring is uniformed and routed neatly.
All connection points/terminals are tight and crimped properly.
All fuses are installed upright with amp rating clearly visible.
Fuse location/block is clearly labeled.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Air Compressors C.C. - 386
*
Pass
Needs Attention
N/A
Air compressor turns on/off with remote/auto and hand controls.
Air compressor does not leak any fluids.
All air lines/couplers are leak free
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Breaker Panels C.C. - 369
*
Pass
Needs Attention
N/A
Breaker label is present on the door with a name for each breaker.
All individual breakers de-energize and re-energize all related components.
Breaker box cover screws are tight.
Main breaker powers down/up all components.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
A.C. Units C.C. - 326
*
Pass
Needs Attention
N/A
Make sure all cool/heat properly.
Make sure all A.C. units drain properly.
Check all A.C. units for proper mounting.
Listen for any abnormal noise coming from ac unit.
Make sure all copper lines have insulation installed.
Make sure all duct work is securely fastened to the units.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
SAT & Wired Internet C.C. - 367
*
Pass
Needs Attention
N/A
Connect internet hard line to transporter or use connection tester to verify the system has connectivity.
Test all connected or related ethernet ports to verify they all have connectivity.
Make sure satellite is mounted properly and sealed to prevent water intrusion.
Check satellite wire penetrations for watertight seal and uniform install.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Solar C.C. - 364
*
Pass
Needs Attention
N/A
Verify that the solar panels are mounted tightly, and fasteners are sealed.
Check wire penetrations for water tight seal and uniform install.
Check all battery connections and crimped ends for tightness and proper mounting.
Verify that the solar panels are charging the related batteries with multi meter.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Volta
*
Pass
Needs Attention
N/A
Verify that the system accepts and holds charge.
Verify all components being powered by volta system energize.
All connections and wire landing are acceptable.
System is mounted properly.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Plumbing
*
Pass
Needs Attention
N/A
All supply lines are routed properly with no leaks.
All evacuation lines are routed properly with no leaks.
All valving works as intended.
All pumps and filters are installed to specification and work properly.
All hardware and accessories are installed tight and correct.
All water discharge areas or components work properly with no leaks.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Propane
*
Pass
Needs Attention
N/A
All supply lines are routed properly with no leaks.
All valving works as intended.
All mounting locations are safe and secure.
All corresponding components work properly and are leak free
All hardware and accessories are installed tight and correct.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Awning C.C. - 095
*
Pass
Needs Attention
N/A
Assemble and test fit awning to transporter.
Check awning for defects and proper fitment.
Check all awning related accessories/receptacles/outlets.
Disassemble awning and pack all components in the proper caring bags.
Comments
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Additional Information:
Additional Photos
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Name
*
First Name
Last Name
Print
Submit
Should be Empty: