EV Charger Maintenance
  • EV Charger Maintenance

  • Charger 1

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Charger Identification

  • Visual Inspection

  • No Visible Damage or Wear*
  • Securely Mounted*
  • Clean & free of obstruction*
  • Charging socket condition*
  • Tethered lead condition*
  • Signage present and legible*
  • Isolation switch accessible*
  • Earth rod present (if TT)*
  • Surge protection device present (if required)*
  • Functional testing

  • Charger Powers Up Correctly*
  • status Light Normal*
  • RFID / keypad working*
  • Communication with backend / app confirmed (if smart)*
  • Locking mechanism (if present) functional*
  • Load management or CT clamp connected and operational*
  • Dead tests

  • Continuity of protective conductors, including main earthing conductor, and main and supplementary protective bonding conductors*
  • Continuity of ring final circuit conductors*
  • Insulation Resistance*
  • Protection by SELV, PELV or electrical separation*
  • Polarity*
  • Live Testing

  • Is Zs within maximum permitted earth fault loop impedance for circuit*
  • PEN Fault Detection Test*
  • Site Specific Checks

  • Safe access around unit*
  • Cable management (trip hazard prevention)*
  • Cable storage facility secure*
  • Lighting for evening use*
  • Maintenance Actions Taken

  • Cleaned unit*
  • Firmware updated*
  • Faults cleared*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Outcome*
  • Recommended next Inspection*
  • Date*
     - -
  • Charger 2

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Charger Identification

  • Visual Inspection

  • No Visible Damage or Wear*
  • Securely Mounted*
  • Clean & free of obstruction*
  • Charging socket condition*
  • Tethered lead condition*
  • Signage present and legible*
  • Isolation switch accessible*
  • Earth rod present (if TT)*
  • Surge protection device present (if required)*
  • Functional testing

  • Charger Powers Up Correctly*
  • status Light Normal*
  • RFID / keypad working*
  • Communication with backend / app confirmed (if smart)*
  • Locking mechanism (if present) functional*
  • Load management or CT clamp connected and operational*
  • Dead tests

  • Continuity of protective conductors, including main earthing conductor, and main and supplementary protective bonding conductors*
  • Continuity of ring final circuit conductors*
  • Insulation Resistance*
  • Protection by SELV, PELV or electrical separation*
  • Polarity*
  • Live Testing

  • Is Zs within maximum permitted earth fault loop impedance for circuit*
  • PEN Fault Detection Test*
  • Site Specific Checks

  • Safe access around unit*
  • Cable management (trip hazard prevention)*
  • Cable storage facility secure*
  • Lighting for evening use*
  • Maintenance Actions Taken

  • Cleaned unit*
  • Firmware updated*
  • Faults cleared*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Outcome*
  • Recommended next Inspection*
  • Date*
     - -
  • Charger 3

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Charger Identification

  • Visual Inspection

  • No Visible Damage or Wear*
  • Securely Mounted*
  • Clean & free of obstruction*
  • Charging socket condition*
  • Tethered lead condition*
  • Signage present and legible*
  • Isolation switch accessible*
  • Earth rod present (if TT)*
  • Surge protection device present (if required)*
  • Functional testing

  • Charger Powers Up Correctly*
  • status Light Normal*
  • RFID / keypad working*
  • Communication with backend / app confirmed (if smart)*
  • Locking mechanism (if present) functional*
  • Load management or CT clamp connected and operational*
  • Dead tests

  • Continuity of protective conductors, including main earthing conductor, and main and supplementary protective bonding conductors*
  • Continuity of ring final circuit conductors*
  • Insulation Resistance*
  • Protection by SELV, PELV or electrical separation*
  • Polarity*
  • Live Testing

  • Is Zs within maximum permitted earth fault loop impedance for circuit*
  • PEN Fault Detection Test*
  • Site Specific Checks

  • Safe access around unit*
  • Cable management (trip hazard prevention)*
  • Cable storage facility secure*
  • Lighting for evening use*
  • Maintenance Actions Taken

  • Cleaned unit*
  • Firmware updated*
  • Faults cleared*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Outcome*
  • Recommended next Inspection*
  • Date*
     - -