FINAL INTERIOR RENOVATION QA CHECKLIST
1. WHOLE HOME / GENERAL AREAS
Site clean and move-in ready (dust-free, no debris or protective film)
Walls, ceilings, and trim evenly painted with no defects
Flooring clean, level, and free of damage or residue
Baseboards, crown, and casings installed and caulked
All doors open/close properly and are aligned
All windows operational, locked, clean, and sealed
Lighting, outlets, and switches functional and labeled
Thermostat(s) tested and functioning
Smoke/CO detectors installed and tested
Vents and registers installed and unobstructed
Final punch list and blue tape items completed
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
2. KITCHEN
Cabinets and drawers open/close smoothly and align properly
Countertops installed, sealed, and damage-free
Backsplash installed and grouted with no cracks or voids
Sink plumbed correctly, no leaks, caulked perimeter
Faucet operational with hot/cold water and proper pressure
Appliances installed, connected, and tested (oven, dishwasher, fridge, microwave, etc.)
GFCIs in place and functioning
Range hood or exhaust fan operational
Flooring transitions seamless to adjacent spaces
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
3. BATHROOMS
Vanity, sink, and faucet installed with no leaks
Toilet secured, flushes properly, and does not rock
Shower/tub installed with watertight seals and proper slope
Caulking around tile, tub, and fixtures complete and neat
Fixtures aligned and operational (towel bars, paper holders, etc.)
Exhaust fan working
Mirror installed level and securely
GFCI outlet functional
Water pressure and temperature checked
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
4. LAUNDRY AREA
Washer/dryer installed and tested
Water connections secure and leak-free
Dryer vent connected properly
Floor drain (if applicable) tested
GFCI outlets present and functioning
Counter/sink area finished and functional (if applicable)
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
5. LIVING ROOM / COMMON AREAS
Walls/ceiling finished to spec with no defects
Flooring complete and transitions smooth
Lighting and switches operational
Built-ins (if any) installed and level
Windows clean and operational
HVAC registers in place and clear
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
6. BEDROOM(S)
Closet systems installed and level
Doors aligned and latching properly
Lighting and electrical functional
Flooring clean and damage-free
Windows secure and operable
Paint/trim complete
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
7. MECHANICAL ROOM / UTILITY CLOSETS
Closet systems installed and level
Equipment installed per plan (HVAC, boiler, water heater, etc.)
All units labeled and accessible
Shutoff valves clearly marked
No leaks, noises, or visible issues
Area clean and code-compliant
Open Items
File Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Quality Control Inspector Name
First Name
Last Name
Date
-
Month
-
Day
Year
Date
Signature
Submit
Should be Empty: