Commercial or Industrial Electric Service Application Logo
  • Commercial or Industrial Electric Service Application

  • Click here to see the Are You Ready for Electric Service Checklist.

  •  - -
  • Your response indicated that you have not reviewed the Commercial/Industrial Ready for Service Checklist. 

    The form can be found at uppco.com or by clicking here. If you need help please contact UPPCO Customer Service. 

    Please close this window

  • Your response indicated that you have not completed a new Commercial Credit Application. This is only required if the new service being requested is for a new commercial customer. If this was a mistake, please select back.

    The Commercial Credit Application can be found at uppco.com or by clicking here. If you need help please contact UPPCO Customer Service.  

    Please close this window

  • Your response indicated that you have not reviewed the Electric Load Survey and have the necessary information. 

    The Electric Load Survey can be found at uppco.com or by clicking here. If you need help please contact UPPCO Customer Service. 

    Please close this window

     

  • Your response indicated that you have not completed and signed the Property Site Sketch and Liability Waiver and/or that you do not have it ready to upload to this application. 

    The form can be found at uppco.com or by clicking here. You may either complete the form online (fillable PDF) and save it to upload or you may print it, complete it on paper and scan or take a photo to upload with the application. If you need help please contact UPPCO Customer Service. 

    Please close this window

    Ensure that you have the Property Site Sketch and Liability Waiver ready to upload before proceeding with the application again.

  • Commercial or Industrial Electric Service Application

  • Billing Information

  • Contact Information

  • Site Information

  • Structure Information

  • Electric Information

  •  - -
  • Present Status of Building Project

  •  - -
  •  - -
  •  - -
  •  - -
  •  - -
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • If you do not already have the property site sketch and liability waiver you can find it here. Please print and complete the form. You may upload it here by attaching it as a PDF or JPG file. Taking a photo of the completed form is acceptable. 

    Failure to provide an accurate and signed property site sketch and liability waiver may impact the timeline of your project. 

    The Liability Waiver and Property Site Sketch is not required for an estimate only. If you can provide a sketch of the site or photos, it may be helpful in estimating the project, but not necessary at this step.

  • Electric Load Survey

  • Project Details

  • New Service

  • Existing Service

  • Load Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  •  
  •  
  •  
  • Ready for Service

  • Please Note: The following requirements must be completed before service can be installed.

    • Property Site Sketch and Liability Waiver must be on file
    • The foundation must be backfilled and within 6” of the final grade
    • A service route must be cleared 10’ wide of brush, etc
    • A company approved meter socket must be provided and installed by the customer
    • Easements need to be signed and on file
    • Customer related construction charges have must be paid
    • A county or state electrical inspection is required to be done prior to UPPCO being able to energize service

    Click here to see UPPCO's Electric Service Manual

    Other Important Details

    • It’s important to contact UPPCO if there are changes to your site.
    • When your service requirements are met, and we are notified that your site is ready, service installation typically begins within 15 business days.
    • After the electric service is installed by UPPCO and your Electrical Inspection is received, the meter is typically set and energized within three business days.
    • These timelines are dependent on the complexity of your job, weather, road restrictions, and crew availability.
    • Winter Construction Charge may apply.
    • We will make every effort to work with your preferred timeline, but reserve the right to make the final call on site readiness and other timeline factors.
  • After submission of this form, you will be able to download a copy of your application.

  • Should be Empty: