Post-Inspection Repair Report
  • Post-Inspection Repair Report

  • Date*
     - -
  • NOTE: Before the pastor moves into the manse, the congregation shall have (a) confirmed to the Property Committee that the repairs required under Section A above have been completed and (b) received the Committee’s sign off on such work.

  • Submitted on behalf of the Property Committee on*
     - -
  • Should be Empty: