Permit Expediting Setup Form Logo
  • Third Party Inspections Set Up Form

    Please provide the following information as accurately and completely as possible.
  • Project Contacts

  • Accounting Information

    Party responsible for contract and payment
  • Third Party Inspections Set Up Procedure

  • Step 1: Complete Required Forms
    DOB requires that the property owner complete a DOB Notice of Intent Form AmeriCode Downloads. If the property owner is not the signing party, a notarized letter confirming the Agent’s authority and identity must also be submitted.

    Step 2: Register in DOB’s Tertius System Tertius Link
    You must create an account in the DOB Tertius System and designate AmeriCode as your Third-Party Inspection Agency. We are required to use Tertius for all TPI and invoice directly through them. 

    Step 3: Upload Permits
    Please upload copies of all approved permits and plans below. If trade permits are still pending, you may email them to us once they are received at inspections@jpl-llc.com

    Step 4: On-Site Documentation Requiredduring ALL INSPECTIONS

    • On-Site Inspection Card AmeriCode Downloads - Must be printed, filled out with project and permit information, and posted at the building entrance before your first inspection.
    • All Permits must be posted at property entrance
    • Approved Plans
  • By signing below, I confirm that I have read and agree to the General Terms and Conditions section above. I am authorized to accept these terms on behalf of my company and the property owner.

  • Powered by Jotform SignClear
  • Please upload the following documents:

    1. All Trade Permits

    2. Approved Plans - if they are too large please email a link to inspections@jpl-llc.com

    3. DOB Notice of Intent

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: