Design Approval Request Form
  • Design Approval Request Form

    Architectural Control Committee
  •  - -
  • Format: (000) 000-0000.
  • Format: (000) 000-0000.
    • Mailing Address (if different) 
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Submitted material will not be returned. Should the committee require additional information; your request will be deferred until additional information is received.

  • Notes:

    1.    The Committee will endeavor to respond within thirty days to any request. Lack of response from ACC does not indicate approval.

    2.   Once approved, the any construction must be completed in a way that does not unreasonably interfere with neighboring properties.

    3.   Applicant has responsibility for removal, in a timely manner (no more than 14 days), of any debris resulting from construction.

    4.   Construction must meet all zoning, building codes, and City and County laws. Further, nothing herein contained shall be construed as a wavier or modification of any such code or law.

    5.    Where applicable, utility easements are to be marked before excavation is started. This service is provided free of charge by New Mexico One Call, and is required to provide for your safety. For location of underground communication, cable TV, electric, gas, water and sewers call New Mexico One Call at (800) 321-2537, no later than two full business days before the day you plan to dig. Please note there may be a FINE if underground cables or conduits are severed.

    6.    Misrepresentation of any items in this request, either oral or written, may void any approval by the Architectural Control Committee.

  • Powered by Jotform SignClear
  •  - -
  • Should be Empty: