Post Incident Analysis Fire
  • Post Incident Analysis Fire

    PIA for Fire
  • Call Type
  •  - -
  • Items Requiring Attention
  • Casulaties
  • Building

  • Suppression and Notification Devices
  • Commercial
  • Residential
  • Structural Integrity on Arrival
  • Structural Integrity at 20 Minutes
  • Type of Exposure
  • Location
  • Exposure Separate Owner
  • Utilities Secured by Fire Deparment
  • Fire Department Forced Entry
  • Building Status Post Fire
  • Incident Command

  • Command
  • Transfer of Command
  • Size Up

  • Size Up
  • On Scene Operations

  • Operational Mode
  • Factors Contributing to Fire Spread
  • First Due Apparatus Properly Positioned
  • Second Due Apparatus Properly Positioned
  • Third Due Apparatus Properly Positioned
  • Command Properly Positioned
  • Rescue Operations
  • Ventilation
  • RIT was Established
  • IRIT Established By
  • Communications

  • Communications with Dispatch (if issues describe below)
  • Communications with Crews Enroute (if issues describe below)
  • Communications On Scene (if issues describe below)
  • Staging

  • Was Staging Used
  • Was Staging Effective
  • Was a Staging Officer Used
  • Support Functions

  • Rehab
  • Utility Agencies
  • Red Cross Called for Family
  • Safety

  • Safety Officer Established
  • Accountability

  • LISHFD Accountability Procedures Followed Throughout Incident
  • Computer Monitoring Personnel on SCBAs was Used
  • Salvage

  • Salvage Operations were Used
  • Salvage Tactics
  • Training

  • Training Deficiencies
  • Investigation

  • Cause and Origin was Determined
  • Cause
  • LISH K-9 Used
  • Assisting Agencies
  • Aid
  • Auto Aid
  • Mutual Aid
  • Should be Empty: