Preference will be given to projects with higher Return on Investment based on all project costs prepared by a licensed contractor in the form of a quote estimate or actual bid. Points will be assigned based on one point from each $10,000 of investment. No points will be awarded for this category if the quotes, estimates, or bids are not from a licensed contractor. 50 possible points
Return on Investment: (50 possible points)
• Total Project cost of $500,000 and over (50pts)
One point per $10,000 invested over $100,000 up to $490,000
• Less than $100,000 (10pts)