You can always press Enter⏎ to continue
FTG Builders Construction Quiz

FTG Builders Construction Quiz

Take the quiz you will be entered for a chance to win $100!
  • 1
    Press
    Enter
  • 2
    Press
    Enter
  • 3

    Amazing {fullName:first}, you're correct!

    Doors and windows are not part of the structural system of a building. While foundations, columns and beams, and roof framing systems are all essential components of the structural system, doors and windows are considered part of the building's envelope or architectural system. They are responsible for providing access, ventilation, and natural light, but they do not contribute to the overall stability and load-bearing capacity of the structure.

    Press
    Enter
  • 4

    Nice try {fullName:first}!  

    Doors and windows are not part of the structural system of a building. While foundations, columns and beams, and roof framing systems are all essential components of the structural system, doors and windows are considered part of the building's envelope or architectural system. They are responsible for providing access, ventilation, and natural light, but they do not contribute to the overall stability and load-bearing capacity of the structure.

    Press
    Enter
  • 5
    Press
    Enter
  • 6

    {fullName:first}, you're correct!

    Concrete is a mixture of cement, water, and aggregates that gradually hardens and gains strength over time through a process called hydration. The hydration process involves the chemical reaction between cement and water, which creates a solid matrix within the concrete. The rate of this reaction is influenced by various factors such as temperature, moisture, and the type of cement used. Generally, it takes around 28 days for concrete to reach its maximum strength and hardness. Therefore, the correct answer is 28 days.

    Press
    Enter
  • 7

    Sorry, that's incorrect {fullName:first}.

    Concrete is a mixture of cement, water, and aggregates that gradually hardens and gains strength over time through a process called hydration. The hydration process involves the chemical reaction between cement and water, which creates a solid matrix within the concrete. The rate of this reaction is influenced by various factors such as temperature, moisture, and the type of cement used. Generally, it takes around 28 days for concrete to reach its maximum strength and hardness. Therefore, the correct answer is 28 days.

    Press
    Enter
  • 8
    Press
    Enter
  • 9

    Correct!

    An addendum is a written document that provides additional information or modifies the original building documents. It is typically issued during the bidding process to clarify or make changes to the project requirements. This allows contractors to have a clear understanding of the project scope and make necessary adjustments to their bids. The addendum ensures that all bidders have access to the same information and helps to maintain a fair and transparent bidding process.d

    Press
    Enter
  • 10

    Incorrect!

    An addendum is a written document that provides additional information or modifies the original building documents. It is typically issued during the bidding process to clarify or make changes to the project requirements. This allows contractors to have a clear understanding of the project scope and make necessary adjustments to their bids. The addendum ensures that all bidders have access to the same information and helps to maintain a fair and transparent bidding process.d

    Press
    Enter
  • 11
    Press
    Enter
  • 12
    Press
    Enter
  • 13

    Wow, you're on fire {fullName:first}!

    The Design / Bid / Build Agreement is considered the Traditional Agreement. The Owner selects and signs agreements with a Design Professional to prepare contract documents (working drawing, specs, agreement forms, bidding info, etc.). Through bidding process General Contractor is selected, and an agreement is formed between General Contractor and Owner.

    Press
    Enter
  • 14

    Close but not quite, {fullName:first}!

    The Design / Bid / Build Agreement is considered the Traditional Agreement. The Owner selects and signs agreements with a Design Professional to prepare contract documents (working drawing, specs, agreement forms, bidding info, etc.). Through bidding process General Contractor is selected, and an agreement is formed between General Contractor and Owner.

    Press
    Enter
  • 15
    Press
    Enter
  • 16

    Bingo {fullName:first}!

    FTG Builders was founded in Silicon Valley California in 2015.  We have since expanded into Arizona and Nevada.

    Press
    Enter
  • 17

    You almost got it {fullName:first}.

    FTG Builders was founded in Silicon Valley California in 2015.  We have since expanded into Arizona and Nevada.

    Press
    Enter
  • 18
    Press
    Enter
  • 19

    Absolutely right {fullName:first}!

    Admixtures are substances added to a concrete batch immediately before or during its mixing to alter or enhance specific properties of the concrete. They can be used to improve workability, durability, strength, or setting time of the concrete. Admixtures can include chemicals such as water reducers, accelerators, retarders, air-entraining agents, and superplasticizers. These substances are added in small quantities and have a significant impact on the performance and characteristics of the concrete.

    Press
    Enter
  • 20

    So close {fullName:first}!

    Admixtures are substances added to a concrete batch immediately before or during its mixing to alter or enhance specific properties of the concrete. They can be used to improve workability, durability, strength, or setting time of the concrete. Admixtures can include chemicals such as water reducers, accelerators, retarders, air-entraining agents, and superplasticizers. These substances are added in small quantities and have a significant impact on the performance and characteristics of the concrete.

    Press
    Enter
  • 21
    Press
    Enter
  • 22

    You're doing great {fullName:first}!

    The Eiffel Tower is made of cast iron. This material was chosen for its strength and durability. Cast iron can withstand the weight of the tower and the forces of wind and weather. It also provides a solid structure for the intricate lattice design of the tower.

    Press
    Enter
  • 23

    Almost!

    The Eiffel Tower is made of cast iron. This material was chosen for its strength and durability. Cast iron can withstand the weight of the tower and the forces of wind and weather. It also provides a solid structure for the intricate lattice design of the tower.

    Press
    Enter
  • 24
    Press
    Enter
  • 25

    You got it {fullName:first}!

    Schematic Contingencies is not a type of budget contingency. The other options listed - Escalation, Construction Contingencies, and Design Contingencies - are all types of budget contingencies commonly used in project management. Schematic Contingencies, on the other hand, is not a recognized term or practice in budgeting and project management.

    Press
    Enter
  • 26

    Almost {fullName:first}...

    Schematic Contingencies is not a type of budget contingency. The other options listed - Escalation, Construction Contingencies, and Design Contingencies - are all types of budget contingencies commonly used in project management. Schematic Contingencies, on the other hand, is not a recognized term or practice in budgeting and project management.

    Press
    Enter
  • 27
    Press
    Enter
  • 28

    You're right {fullName:first}!

    A construction change order is a formal amendment to the original contract that documents changes to the project's scope of work, cost, or schedule. It is a written agreement that must be signed by all parties involved to account for modifications, such as adding or removing features, or adjusting timelines due to unexpected site conditions or client requests.

    Press
    Enter
  • 29

    Almost {fullName:first}.

    A construction change order is a formal amendment to the original contract that documents changes to the project's scope of work, cost, or schedule. It is a written agreement that must be signed by all parties involved to account for modifications, such as adding or removing features, or adjusting timelines due to unexpected site conditions or client requests.

    Press
    Enter
  • 30
    Press
    Enter
  • 31

    Correct!

    FTG Builders is a commercial general contractor specializing in healthcare and higher education renovations for a variety of hospitals, healthcare systems, medical offices and universities. Renovations may include seismic upgrades, interior or exterior improvements.

    Press
    Enter
  • 32

    Incorrect!

    FTG Builders is a commercial general contractor specializing in healthcare and higher education renovations for a variety of hospitals, healthcare systems, medical offices and universities. Renovations may include seismic upgrades, interior or exterior improvements.

    Press
    Enter
  • 33
    Press
    Enter
  • 34
    Press
    Enter
  • 35

    Thanks for completing the FTG Builders quiz {fullName:first}!! 

     

    You got a

    PERFECT SCORE!!!

    🥳

    {totalScore}/10

     

    To be entered into the prize drawing or join our talent network and stay in the loop on new opportunities, please complete our candidate connect form by clicking the SUBMIT button below.

     

    www.ftgbuilders.com

    Press
    Enter
  • 36

    Thanks for completing the FTG Builders quiz! 

     

    Great job {fullName:first}!!!

    Your score is:

    {totalScore}/10

     

    To be entered into the prize drawing or join our talent network and stay in the loop on new opportunities,SUBMIT button below.

     

    www.ftgbuilders.com

    Press
    Enter
  • 37

     

    Thanks for completing the FTG Builders quiz! 

     

    Nice Try {fullName:first}!

    Your score is:

    {totalScore}/10

     

    To join our talent network and stay in the loop on new opportunities, please complete our candidate connect form by clicking the SUBMIT button below.

     

    www.ftgbuilders.com

    Press
    Enter
  • Should be Empty:
Question Label
1 of 37See AllGo Back
close