Submit Your Project: 2025 Tekla BIM Awards ANZ Logo
  • Submit your project for the 2025 Tekla BIM Awards ANZ.

  • Project Story, Entry Materials and Requirements
    The BIM story of your project is the most important part of the submission. In addition, the Tekla project/model folder is an essential part of the entry. High quality model images and photos help communicate your story.


    Mandatory materials:
    • The full Tekla Structures model folder and/or Tekla Structural Designer model (.TSMD)
    • High resolution screenshots of the model (.PNG file format preferred)
    • Rename your screenshots, give a description of what is being shown

     

    Recommended materials:
    • All IFC and additional reference models relevant for the project entry
    • Video clips from the project: (visualisation clips, or any other content relevant for the project to be successful in the competition)
    • High resolution photos or architect visualisations of the project (in any image format, 1000+ pixels in width/height or more preferred).
    • Sample drawings of the projects (in PDF format)
    • Any additional material - BIM execution plan, presentation, videos, media coverage you already have to make your project stand out

     

    Copy the following files manually, into the submitted model folder:
    • Profile database (profdb.BIN)
    • Material database (matdb.BIN)
    • Bolt database (screwdb.DB)
    • Bolt assembly database (assdb.DB)
    • Rebar database (rebar_database.INP)
    • Parametric profiles (profitab.INP)
    • Drawing Templates (*.tpl)

    Alternatively, use any cloud or file sharing service you feel comfortable with (Dropbox, Google Drive, OneDrive) and provide a link where we can download your entry material.

  • Project Information

    Tell us as much as you can about the project.
  • Your Project in Numbers

  • Should be Empty: