Company
*
Orientation Date
*
/
Month
/
Day
Year
Date
Norco College
*
Project Number
*
Visitors Name
*
1. Working safely is a condition of access, and disiplinary actions are associated with failure to adhere to this or other project site requirements
*
Yes
2. All drivers must folow and comply with all safety signage and regulations
*
Yes
3. At no time will a driver be allowed to utilize a mobile phone while operating a vehicle/equipment
*
Yes
4. You must stay with your truck at all times. For additional assistance please contact your point of contact or a PWJV representative
*
Yes
5. All incidents including near misses, injuries, equipment damage, property damage and or spills must be reported to PCL immediately regardless of severity
*
Yes
6. In the event of an emergency you will hear 3 loud hors indicating you are to evacuate as safely as possible and go to your emergency muster/meeting point
*
Yes
7. Driver/truck must be escorted while on site and during loading/unloading
*
Yes
8. Only load/unload in the designated area specified by your point of contact or by a PWJV representative
*
Yes
9. Prior to off loading, verify load hasn't shifted and area is clear of workers
*
Yes
10. Do not stand where material can shift onto you and don't stand on materials when securing or strapping down material
*
Yes
11. Stay clear of forklift or other equipment loading/unloading
*
Yes
12. The following personal protective equipment is required 100% when entering the PWJV site: (Hard hats, safety glasses, shirt with min 4" sleeves, steel or composite toe boots, gloves, class 2 vest, long pants) If you are missing any of these items, you MUST remain in your truck until further instructions are provided by your point of contact or a PWJV representative
*
Yes
Driver's Name
*
Driver's Signature
*
Facilitator's Name
*
Submit
Should be Empty: