• Intake Form

  • Property Information

  • Your Contact Information

  • Does your company currently have a master services agreement with Plummer*
  • Format: (000) 000-0000.
  • Billing Information

  • Format: (000) 000-0000.
  • Which Service are you Requesting?

  • ECM (Energy Consumption Model) Utility Allowance
    A detailed analysis of projected energy and water consumption based on building design, systems, equipment, and utility responsibilities. Typically used for LIHTC, underwriting, utility allowances, and agency submissions.

    HUSM (HUD Utility Schedule Model)
    A HUD-approved utility allowance methodology used to develop utility allowances based on location, utility rates, unit characteristics, and utility responsibilities.

    Utility Allowance Estimate
    A preliminary utility allowance estimate used for budgeting, underwriting, planning, or early project feasibility before a final utility allowance methodology is selected.

    Common Area Analysis
    An evaluation of owner-paid and common-area utility usage, including common spaces, site lighting, laundry facilities, offices, elevators, and other non-residential loads.

  • Service Requested*
  • Not sure which service you need?

    Select the option that seems most appropriate and provide additional details in the Notes section. Our team will review the request and contact you if a different service would be more appropriate.

  • ECM Questions

  • Project Snapshot

  • Certificate of Occupancy Date
     - -
  • Expected UA Implementation date*
     - -
  • Will there be any HUD Regulated Buildings or RHS funding?*
  • Energy/Code Information

  • Building Certifications

  • Check all that apply*
  • Unit Mix and Types

  • Rows
  • Documents & Access

  • Please check off all the items below that you have*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Procore Access

  • Plummer Can Be Granted Procore Access*
  • Current Utility Allowance Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Utility Information

  • Rows
  • Rows
  • Rows
  • Building Systems

    Provide information on major appliances and building systems
  • Will units have washer/dryer hookups?
  • Will there be a common area laundry facility on site?
  • Rows
  • Rows
  • Renewable/Alternative Energy

    Tell us about any renewable energy or alternative energy systems on the property
  • Is there a renewable benefit that is or will be passed to residents*
  • Alternative Energy Sources*
  • Additional Utility Information

    Provide any additional documentation and information
  • Do you have will-serve letters from Utility Providers*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • If the property is an existing property, please upload one resident utility bill for each utility type. For example, if residents pay electric and gas utilities, provide one electric bill and one gas bill. Do not upload bills for every resident.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • If this is an existing property and residents pay utilities through the property, please upload one month's utility bill(s) for the applicable utility services.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Common Area Analysis Questions

  • Energy/Code Information

  • Building Certifications

  • Check all that apply*
  • Documents & Access

  • Please check off all the items below that you have*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Procore Access

  • Plummer Can Be Granted Procore Access*
  • Utility Information

  • Rows
  • Building Systems

    Provide information on major appliances and building systems
  • Rows
  • Renewable/Alternative Energy

    Tell us about any renewable energy or alternative energy systems on the property
  • Alternative Energy Sources*
  • HUSM Questions

  • Utility Information

  • Rows
  • Rows
  • Rows
  • Building Characteristics

  • Utility Allowance Estimate Questions

  • Unit Mix and Types

  • Rows
  • Utility Information

  • Rows
  • Rows
  • Rows
  • Final Review & Submit

    Please review your information before submitting.
  • *
  • Should be Empty: