Solar & Storage Live Malaysia 2026 - Form 4 (Lighting and Electrical Rental) Logo
  • FORM 4 - LIGHTING AND ELECTRICAL RENTAL

    EARLY BIRD DEADLINE: FRIDAY, 6 MARCH 2026
  • For any queries related to this form, please contact: 

    Pico Art International Pte Ltd

    Tori CHANG (Ms)
    Email: tori.chang@pico.com

  • Important Note:

    1. For Exhibitors with additional lighting and electrical order, please complete this form and return it on or before Friday, 6 March 2026.
    2.  As equipment is limited, please order in advance by 6 March 2026 to enjoy early bird rates. Standard rates will apply from 7 March 2026.

      Early Bird Rate On or before 6 March 2026
      Standard Rate 7 March 2026  -  9 April 2026
    3. All items are on rental basis only. All orders must be accompanied with proof of remittance. Orders without payment will not be entertained. Full payment is due before installation and delivery.

    4. Facilities and services not indicated on the forms are subject to quotation and availability. 24 hours electrical supply must be ordered separately on individual job basis.

    5. Cancellation of orders must be submitted in writing. There will be no refund for any cancellation.

    6. Strictly no extension cords or multipoint connection are allowed in the Exhibition Hall.

    7. A cancellation fee of 50% will be imposed on the respective confirmed items cancelled on or before 6 March 2026.

    8. A cancellation fee of 100% will be imposed on the respective items cancelled between 7 March 2026 to 9 April 2026.

  • EXHIBITOR DETAILS

  •  - -
  • ELECTRICAL RENTAL FOR BUILD-UP AND EXHIBITION DAYS

  • Please note the following before selecting electrical requirement for build-up and exhibition days:

    1. A cancellation fee of 50% will be imposed on the respective confirmed items cancelled on or before 6 March 2026.

    2. A cancellation fee of 100% will be imposed on the respective items cancelled between 7 March 2026 to 9 April 2026.

    3. Power supply circuit breaker does not come with any extension. Should you require socket connections, please order in the options below.

    4. Any illegal connection or adaptation found will be subject to electrical termination without prior notification and any penalty charges to be borned by Exhibitor. The standard supply is 220V or 380V with approximately 10% fluctuation. For the safety of your equipment, please use a stabilizer.

  • Categories:All
    All
    prevnext( X )
                13 Amp/240V Temporary Power Supply for Space Only (Raw Space) during Build Up  Product Image
                13 Amp/240V Temporary Power Supply for Space Only (Raw Space) during Build Up
                180.00MYR
                  
                36W Fluorescent Tube  Product Image
                36W Fluorescent Tube
                90.00MYR
                  
                2ft/3ft/4ft T5 Fluorescent Tube for Lightbox Product Image
                2ft/3ft/4ft T5 Fluorescent Tube for Lightbox
                150.00MYR
                  
                LED Spotlight (Warm) Product Image
                LED Spotlight (Warm)
                140.00MYR
                  
                LED Spotlight (White)  Product Image
                LED Spotlight (White)
                140.00MYR
                  
                LED Longarm Spotlight (Warm)  Product Image
                LED Longarm Spotlight (Warm)
                150.00MYR
                  
                LED Longarm Spotlight (White) Product Image
                LED Longarm Spotlight (White)
                150.00MYR
                  
                LED Downlight (Warm)  Product Image
                LED Downlight (Warm)
                150.00MYR
                  
                LED Downlight (White) Product Image
                LED Downlight (White)
                150.00MYR
                  
                LED Arm Metal Halide Product Image
                LED Arm Metal Halide
                400.00MYR
                  
                13Amp/240V Power socket/point (Max 300W) Product Image
                13Amp/240V Power socket/point (Max 300W)
                120.00MYR
                  
                24 hrs 13Amp/240V Power socket/point Product Image
                24 hrs 13Amp/240V Power socket/point
                180.00MYR
                  
                15Amp/240V Power socket/point (Max 1000W)
                190.00MYR
                  
                32Amp Single-phase power
                1,500.00MYR
                  
                32Amp Three-Phase power
                1,800.00MYR
                  
                63Amp 3-Phase power
                3,000.00MYR
                  
                Lighting Connection (For Light / Per Connection)
                130.00MYR
                  
                LED Strips Connection (per m run)
                130.00MYR
                  
                Subtotal
                0.00MYR
                Tax
                0.00MYR
                Total
                0.00MYR
              • PAYMENT DETAILS

                1. Prices stated are exclusive of bank transfer fees.

                2. All orders must be accompanied with proof of remittance. Orders without payment will not be entertained. Full payment is due before installation and delivery.

                3. Payment can be made via Telegraphic Transfer to:
                  Account Name: PICO INTERNATIONAL (M) SDN BHD
                  Acccount No. (MYR): 80-0303901-1
                  Acccount No. (SGD): 8-00013639-0-02
                  Acccount No. (USD): 8-00003733-4-40
                  Bank Name: CIMB BANK BERHAD
                  Bank Address: B-G-8, BLOCK B PLAZA ATIVO, JALAN 9/1 DAMANSARA AVENUE, BANDAR SRI DAMANSARA, 52200 KUALA LUMPUR, MALAYSIA
                  SWIFT Code: CIMBBMYKL

                  Note: Please make the payment in MYR / USD. A copy of the payment slip has to be sent to tori.chang@pico.com 

                4. For on-site payment, only cash is accepted.
              • * By clicking the Submit button, you confirm that you have read the terms and conditions, that you understand them and that you agree to be bound by them.

              •  
              • Should be Empty: