Hot Tap
Project/Location
*
Date
*
-
Month
-
Day
Year
Date
1. Size of the main pipe
2. Size of the Branch Pipe
3. Hot tap Quantity
No. of Hot Tap
4. Line of Pressure
150 PSi
250 PSI
Other
5. Line Temperature
F (Example: 250 F @ 250 PSI)
6. Pipe Schedule
SCH40
SCH80
Other
7. Pipe Material
Yes
Carbon Steel
No
Stainless Steel
Other
8. Valve Type
Gate Valve
Butterfly Valve
Ball Valve
Other
9.Type of Connection
Threaded
Welded
Flanged
Other
10.Requires a ladder
Yes
No
if yes, height from floor
11. Welding carried by Wellfab
Yes
No
12. Space around the pipe
3ft
4ft
5ft
Other
13. Pipe insulated
Yes
No
14. Provided a picture of the area of tap
Yes
No
15. Service in the system
Heating
Cooling
Steam
Natural Gas
Glycol
Other
16. Available power source nearby
Yes
No
if Yes, please specify
17. Valve position
Top side (90)
Bottom side
Upper side (45)
Lower side (45)
Message
Submit
Should be Empty: