INTERNAL METADATA
KEY-SYS__ORGID
KEY-SYS__ORGNAME
KEY-FORM__NAME
KEY-SYS__DEVICEID
KEY-SYS__SUBMIT__EMAIL
KEY-SYS__BACKOFFICE__EMAIL
KEY-SYS__SUBMIT__PHONE
KEY-SYS__CONFIRM__EMAIL
KEY-SYS__SITEID
Visit__Type
unit_name
KEY-SYS__ISSUES
Site Checkout & Quality Assurance
Site ID
Site Name
*
RTU Gateway ID
*
Technician Email
*
Technician Name
Back Office Email
Technician Phone Number (WhatsApp)
*
Use + in the beginning on the numbet
Scope of Work
Please Select
New Installation
SLA
Upgrade (Projects)
Date
/
Month
/
Day
Year
Date
Hour Minutes
KPIs
Nominal AC Voltage
Please Select
110V
220V
230V
240V
Phase Configuration
Please Select
Single Phase (L-N)
Three Phase (L1–L2–L3–N)
DG Battery Configuration
Please Select
12V
24V
Power Layout Configuration
Power Mapping
Rows
Can you see available data on Panorama
Grid
Yes
No
N/A
Rectifier
Yes
No
N/A
Container / Shelter
Yes
No
N/A
Smart Battery
Yes
No
N/A
Generator
Yes
No
N/A
AC Meters
Yes
No
N/A
Fuel
Yes
No
N/A
Solar
Yes
No
N/A
Fuel Tank
Yes
No
N/A
DC Meter
Yes
No
N/A
Room
Yes
No
N/A
Cabinet
Yes
No
N/A
Grid Parameters
Grid Parameters
Rows
AC Voltage (V)
180-260V
AC Current (A)
>2A
AC PF
Between 0-1
Phase 1
Phase 2
Phase 3
Grid Phase Voltage. L1
Grid Phase Current. L1
Grid Power Factor. L1
Grid Phase Voltage. L2
Grid Phase Current. L2
Grid Power Factor. L2
Grid Phase Voltage. L3
Grid Phase Current. L3
Grid Power Factor. L3
AC kWh
Greater than 0 - at lease 10 minutes after connecting it
Free Cooling Parameters
Free Cooling Fan 1 speed control
Air conditioner 1 operation control (on/off)
Air conditioner 2 operation control (on/off)
Air conditioner 1 Temperature
Air conditioner 2 Temperature
More Parameters
Rectifier Connected?
Please Select
Yes
No
System Voltage
Load Current (A) I-Load
Battery Current (A) I-Batt
Battery SOC
Consumer Load
Consumer Load Source
Rectifier or Tenants
LIB Installed?
Please Select
Yes
No
LIB Model
Please Select
AMPower_Durathon_E4815
Changhong
Delta_AmoGreenTech
Delta_Huawei
Delta_Polarium_LFP
Delta_Polarium_NMC
Eltek_Wing
Enersys_SFX_MCU1_Polarium
Enetek_Shoto
Huawei_ESM48xx
Leoch
LG CHEM
Megmeet_Vision_LFP
NARADA_100AH
NARADA_200AH
Polarium
RPT_NMC48235
SacredSun_Shoto_SDA10
Sunwoda_ST48150A1
Vertiv_M530B_AmoGreenTech
Vertiv_M830B_NCU_AmoGreenTech
Vestwoods
Vision_V_LFP8100
Other
LIB Model
LIB SPD Installed?
No. of batteries Installed
No. of batteries Reporting
Battery SOH
Battery SOC
No. of Faulty LIBs
DC Load Voltage (V)
Not Negative (48V - 60V)
DC Total Current (A)
Between 2A - 500A
DC Vs Rectifier Usys Variance [%]
Less than 2%
I-Load Vs DC Variance [%]
Less than 2%
Mobile network signal strength
Tenants
Number of Tenants
Please Select
0
1
2
3
Tenant 1 Name
Please Select
Tenant #1
Tenant #2
Tenant #3
Other
Tenant 1 Name - Other
Tenant 1 AC Parameters
Rows
AC Voltage (V)
180-260V
AC Current (A)
>2A
AC PF
Between 0-1
AC kWh
After 10 minutes
>0
Phase 1
Phase 2
Phase 3
AC Voltage (V)
180 - 260V
AC Current (A)
Greater than 2A
AC PF
Between 0-1
AC kWh - After 10 minutes
Greater than 0
Tenant 2 Name
Please Select
Tenant #1
Tenant #2
Tenant #3
Other
Tenant 2 Name - Other
Tenant 2 AC Parameters
Rows
AC Voltage (V)
180-260V
AC Current (A)
>2A
AC PF
Between 0-1
AC kWh
After 10 minutes
>0
Phase 1
Phase 2
Phase 3
AC Voltage (V)
180 - 260V
AC Current (A)
Greater than 2A
AC PF
Between 0-1
AC kWh - After 10 minutes
Greater than 0
Tenant 3 Name
Please Select
Tenant #1
Tenant #2
Tenant #3
Other
Tenant 3 Name - Other
Tenant 3 AC Parameters
Rows
AC Voltage (V)
180-260V
AC Current (A)
>2A
AC PF
Between 0-1
AC kWh
After 10 minutes
>0
Phase 1
Phase 2
Phase 3
AC Voltage (V)
180 - 260V
AC Current (A)
Greater than 2A
AC PF
Between 0-1
AC kWh - After 10 minutes
Greater than 0
Tenant Equipment & Load
Rows
Yes/No
Status
Notes
Number of tenants on site confirmed (Place count in notes/comment)
Yes
No
Ok
missing
faulty
All tenant loads captured by RMS
Yes
No
Ok
missing
faulty
Compare the sum of tenant’s load vs Rectifier Total Load
Matching (withing ± 10Amps)
Not Matching (Outside ± 10
Amps)
Yes
No
Ok
missing
faulty
SIM Card & Network Connectivity
Rows
Yes/No
Value
Notes
SIM card present and active
Yes
No
Mobile network signal strength (Place dBm% in notes)
Yes
No
Alarms Tested
Have you tested all the alarms based on the technical booklet?
Please Select
Yes
No
Why? and what is missing?
Alarms Tested
Rows
Triggering on Panorama
Not Installed
Reason
Hatch Open
Smoke Alarm
Door Sensor
Temperature Sensor
Motion Detection
Water on floor
AWL fail
SOW Validation
SOW Validation
Rows
Yes/No
Hatch Sensor
Yes
No
Fuel Box Hatch Sensor
Yes
No
Equipment Earthing Status
Yes
No
Gateway Communicating Real Time?
Yes
No
Data Logger Updated & Connected?
Yes
No
AC Sharing Parties
Yes
No
DG Panel Integration Status
Yes
No
Free Cooling Unit Installed?
Yes
No
All Tenants Metered
Yes
No
Is Site Specific Scope Fully Completed? (SOW Evaluation)
Yes
No
Pending (Not Completed) Scope - Select all applicable, press Ctrl to select multiple
Unit Connectivity
Grid Monitoring
DG Panel Integration
Rectifier Panel Integration
Smart Battery Integration
Fuel Monitoring
AC Colo Metering
Door Sensor(s)
Smoke Sensor(s)
Temperature Monitoring
Movement Sensor(s)
Vibration Detector(s)
Free Cooling Unit
None
Issue Log (Comments with relation to pending scope if any)
Please confirm all entries are accurate before submission
Submit
Should be Empty: