EV Charger Pre-Installation Information Form
  • Form

  • Heading

    To provide an accurate quotation for your EV charger installation, we kindly ask you to complete the form below and upload the requested photos/videos.This information helps us assess the work involved and avoid any unexpected issues on installation day.Please ensure photos are clear and videos are taken slowly.
  • Format: (000) 000-0000.
  • Have you Been SEAI EV Home Charger Grant Approved?*
  • Tethered (Cable attached to Unit) or Un-Tethered (Use of your own or Supplied Cable)*
  • Do you have Earth Bonding Cable in your Hot Press (Yellow & Green Cable Looped between copper pipework*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Do you have a Earth Rod at your property (Usually a green square box located outside flush with the pavement)*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Where is your Fuseboard Located
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Please Note:

    If the Cable Route would Cause excessive Disruption to your property, an Additional ESB External Fuseboard Installation May be required.

    This is not included in the Standard Installation and May occur additional costs.

  • Should be Empty: