- Start Mode — What would you like to do first?*
- Is the current contractor information already on file and up to date? -- This includes, license details, logo, and signature used on plan sets.*
-
-
-
-
-
-
Format: (000) 000-0000.
-
-
-
-
-
- Is this project New Construction or Retrofit?*
- How will you provide the architectural plans?*
-
-
- We must verify the full client name exactly as it appears on the utility bill and the full service address before starting plans. How would you like to provide this information?*
-
-
-
-
-
-
- Is there an existing utility net energy metering (NEM) or interconnection agreement for this site?*
-
-
-
- Existing PV (solar) on site?*
-
- How will you provide documentation for the existing PV system?*
-
-
-
- Existing ESS (battery) on site?*
-
- How will you provide documentation for the existing ESS (battery) system?*
-
-
-
- Existing backup generator on site?*
-
- How will you provide documentation for the existing generator system?*
-
-
-
- Adding NEW PV in this project?*
-
- Mounting Type*
-
-
-
- Add a second module type?*
- Second Mounting Type*
-
-
-
-
-
- Ground Mount Material*
- Roof Framing Details — Use defaults or enter details?*
- Roof Framing Type*
-
-
-
-
-
-
-
-
-
-
- Pergola new or existing?*
- Pergola material*
-
-
- PV system type*
-
-
-
-
- Add another new inverter/micro/optimizer type?*
-
-
-
- Adding NEW ESS (battery) in this project?*
-
-
-
- Add a second battery type? (If the model number is different, enter it as a second battery type (e.g., Powerwall 3 vs Powerwall Expansion Unit, aPower2 vs aPower S).*
-
-
- Is a reduced battery output strategy being considered for this project?*
-
- Will you upload battery spec sheets?*
-
-
- ESS Location*
-
- Is the ESS location subject to potential vehicle impact? *
-
- Bollards / curb stop requested for ESS protection? *
-
- Battery Arrangement*
-
- Mounting Type (ESS)*
-
- Structural anchoring material for ESS / battery mounting (material fasteners will anchor into)*
-
- Is the mounting structure new or existing for this project?*
-
-
-
- How does this ESS control device connect to the utility or service equipment?*
-
-
-
- Will you upload ESS metering or control device spec sheets?*
-
- Adding NEW backup generator in this project?*
-
-
-
-
-
-
-
-
-
- Adding NEW EV charger in this project?*
-
-
-
- Adding NEW main service panel upgrade (MSP) in this project?*
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Utility Service Type -- (Are there overhead utility lines coming from the utility pole to the roof or service mast, or does the service enter underground with no overhead lines visible?)*
- Will you upload MSP photos?*
- Main Breaker Location / Feed Orientation -- (Where is the main breaker physically located in the panel, or is the panel hot-bus only with no main breaker present?)*
- Available Breaker Space for PV / ESS -- (Does the MSP have space to install the required PV and/or ESS breaker(s), or is the interconnection planned outside of the MSP (line-side tap, load-side tap, subfeed, etc.)? If unsure, select “Not sure” and upload a photo.)*
-
-
-
-
-
-
-
- PV / ESS Interconnection Method -- (Select how the PV or ESS will be connected to the electrical system (breaker, tap, or other method).*
-
-
- Backup Type*
- How will you provide partial backup load information?*
-
-
-
-
-
-
-
- Upload any additional site audit photos?*
-
-
-
-
- Should be Empty: