Clone of Solar & ESS Plan Set Request Form — v2.0 Working
  • Solar & ESS Plan Set Request Form

    v3.2 (Locked)
  • Start Mode — What would you like to do first?*
  • Is the current contractor information already on file and up to date? -- This includes, license details, logo, and signature used on plan sets.*
  • Format: (000) 000-0000.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Project Identification — How You’ll Recognize This Job

  • Construction Type

  • Is this project New Construction or Retrofit?*
  • How will you provide the architectural plans?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • We must verify the full client name exactly as it appears on the utility bill and the full service address before starting plans. How would you like to provide this information?*
  • Project & Utility Account Information

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Is there an existing utility net energy metering (NEM) or interconnection agreement for this site?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Project Setup — Systems on Site

  • Existing PV (solar) on site?*
  • Existing PV System

  • How will you provide documentation for the existing PV system?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Existing ESS (battery) on site?*
  • Existing ESS System

  • How will you provide documentation for the existing ESS (battery) system?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Existing backup generator on site?*
  • Existing Generator

  • How will you provide documentation for the existing generator system?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Adding NEW PV in this project?*
  • New PV System

  • Mounting Type*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Add a second module type?*
  • Second Mounting Type*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Ground Mount Material*
  • Roof Framing Details — Use defaults or enter details?*
  • Roof Framing Type*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Pergola / Patio Cover

    Structural Shade Structure
  • Pergola new or existing?*
  • Pergola material*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • PV system type*
  • New Inverters / Microinverters / DC-DC Converters

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Add another new inverter/micro/optimizer type?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Adding NEW ESS (battery) in this project?*
  • New ESS System

  • Add a second battery type? (If the model number is different, enter it as a second battery type (e.g., Powerwall 3 vs Powerwall Expansion Unit, aPower2 vs aPower S).*
  • Is a reduced battery output strategy being considered for this project?*
  • Will you upload battery spec sheets?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • ESS Location*
  • Is the ESS location subject to potential vehicle impact? *
  • Bollards / curb stop requested for ESS protection? *
  • Battery Arrangement*
  • Mounting Type (ESS)*
  • Structural anchoring material for ESS / battery mounting (material fasteners will anchor into)*
  • Is the mounting structure new or existing for this project?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • How does this ESS control device connect to the utility or service equipment?*
  • Will you upload ESS metering or control device spec sheets?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Adding NEW backup generator in this project?*
  • New Generator System

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Adding NEW EV charger in this project?*
  • EV Charger

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Adding NEW main service panel upgrade (MSP) in this project?*
  • Main Panel Upgrade

  • Site Overview

    Create a marked-up site plan or satellite image that clearly shows the locations of the following:
    • Main Service Panel (MSP)
    • Utility Meter
    • Existing equipment locations
    • PV layout
    • Inverter/combiner
    • Battery
    • Controller/MID
    • Backup load panel
    • Generator
    • Fuel source 
    • Transfer switch 
    • Backup load panel
    • EV charger
    • New MSP location
  • Zoom to show the full property, take a screenshot, save it, and upload it below for equipment location markup. 

    Click here to open Google Maps in satellite view:
    https://www.google.com/maps

     

     

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Utility Service Type -- (Are there overhead utility lines coming from the utility pole to the roof or service mast, or does the service enter underground with no overhead lines visible?)*
  • Will you upload MSP photos?*
  • Main Breaker Location / Feed Orientation -- (Where is the main breaker physically located in the panel, or is the panel hot-bus only with no main breaker present?)*
  • Available Breaker Space for PV / ESS -- (Does the MSP have space to install the required PV and/or ESS breaker(s), or is the interconnection planned outside of the MSP (line-side tap, load-side tap, subfeed, etc.)? If unsure, select “Not sure” and upload a photo.)*
  • MSP (Main Service Panel) Information

    This refers to the meter-main combination panel or the first service-rated panel downstream of a detached utility meter.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • PV / ESS Interconnection Method -- (Select how the PV or ESS will be connected to the electrical system (breaker, tap, or other method).*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Backup Type*
  • How will you provide partial backup load information?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Additional Equipment Specs (Optional)

  • Custom Project Notes

  • Upload any additional site audit photos?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: