• Visitor Site Orientation Checklist

    Visitor Site Orientation Checklist

  • HSE Orientation and Training Standard HSE-03-04

  • Orientation Date*
     / /
  • Three blasts of an air horn = emergency evacuation procedure.  Meet at muster point located in jobsite parking lot.

  • 1. Has a review of the Emergency Response/Project Site Plot Plan been completed?*
  • 100% tie-off is required for work above six-feet.

  • 2. Has the 6 foot fall protection requirement been explained to the visitor?*
  • Review today's jobsite hazards and sign-off on the PSI (located on the wall next to the entry door) before entering the jobsite.

  • 3. Has the Pre-Job Safety Instruction (PSI) program been explained and reviewed with the visitor?*
  • 4. All visitors are required to remain with your assigned escort at all times while on site. Acknowledge your understanding of this requirement below.*
  • 5. Please see below for PPE requirements for this job site. Acknowledge your understanding of this requirement by making a selection below.*
  • 5.1 What personal protective equipment is required?*
  • Part 2: Orientation Acknowledgment

    This form will be retained on file at the project worksite location

  • STOP. Please hand phone/tablet to Nordic PCL employee for completion.

  •  
  • Should be Empty: