HSE Orientation and Training Standard HSE-03-03
Part One: The General HSE Orientation Have the following been reviewed with the short duration worker:
This project adheres to Nordic PCL's Safety Manual, EM385-1-1, HIOSH, and Your Company's Safety Program. The most stringent will apply.
PCL's policies and expectations for behavior, ethics, and work performance are outlined within this document.
The site plot plan is located on the wall next to the door.
Regular working hours are 7:00am - 3:30pm, Monday through Friday.
Please comply with all HSE posted signage.
Deposit all trash in designated trash receptacles. Reference locations on the site plot plan.
A competent person is required for scaffold use.
Type 1A or better fiberglass ladders only.
If you remove a guardrail, please replace it immediately.
100% tie-off is required when working at six feet or above.
It is your right to refuse any work you feel is unsafe. Report any misconduct or harassment violations to the Nordic PCL management team immediately.
Three blasts from an air horn = emergency evacuation procedure. Meet at muster point located in jobsite parking lot.
Report all injuries, near misses, vehicle damage, and property damage to NPCL immediately.