Prior to testing:
Where the conductors to be tested are part of circuits that are connected to live electrical systems, de-energize and lockout/tagout (LOTO) all possible sources or voltage.
Completely de-terminate all test condutors at all points of termination.
Clean, seperate, and support test conductors at both ends to eliminate risk of conductor incidental contact.
Insulate and construct physical barricades/boundaries to expose conductive portions of the test conductors at the non-testing end to eliminate incidental contact.
Testing reminders:
Be sure leads make constant contact with the conductors.
On 120V to 480V circuits, use the 500V setting unless instructed otherwise.