1. Personal Information
Full Name:
*
Contact Number:
*
Email:
*
Property Address:
*
Eircode:
*
MPRN (11-digit number from electricity bill):
*
Is this your primary residence?
*
Yes
No
What date did you move here?
*
-
Month
-
Day
Year
Date
Back
Next
2. Property Details
Property Type:
Detached
Semi-Detached
Terraced
Apartment
Approx. year built (if known):
Approx. Floor Area m²
No. of Bedrooms:
Has the home been extended in the last 10 years?
Yes
No
If yes, year extended:
Brief description:
Do you know your current BER rating?
Yes
No / Unsure
If Yes, What is Your BER Rating:
Have any retrofit or insulation works been carried out previously?
Yes
No
If yes, please describe:
Have any SEAI or Local Authority grants been claimed for this property?
Yes
No
If yes, please describe:
Back
Next
3. Ownership & Occupancy
Are you the owner of the property?
Yes
No
If No, what is your relationship to the property?
Is the property currently occupied?
Yes
No
Purpose of retrofit:
Owner-Occupied
Rental
Sale
Other
Back
Next
4. Heating & Energy Use
Main heating system:
Oil
Gas
Solid Fuel / Stove
Electric
Heat Pump
Other
Attic insulation present?
Yes
No
Unsure
Wall insulation present?
Cavity
Internal (Dry-Lining)
External
None
Unsure
Windows - Frame Type:
PVC
Aluminium
Timber
Mixed
Unsure
Windows - Glazing:
Single
Double
Triple
Mixed
Unsure
Back
Next
5. Retrofit Interests
Which measures are you interested in? (Tick all that apply)
Solar PV
Heat Pump
Wall Insulation
Attic Insulation
Floor Insulation
Windows & Doors
Ventilation / Airtightness
LED / Electrical Upgrades
EV Charger
Main goals for retrofit:
Reduce energy bills
Improve comfort
Lower carbon footprint
Access SEAI grants
Other
Are you planning an extension as part of the retrofit?
Yes
No
If yes, Are the drawings in place? (If yes, please attach them on your return email)
Yes
No
Back
Next
6. Financial & Grant Information
Have you previously received SEAI grants for this property?
Yes
No
If Yes Please Enter Details
How do you intend to fund the works?
Finance / Loan
Savings
Combination
Not sure yet
Are you aware a BER assessment and technical survey are required?
Yes
No
Back
Next
7. Next Steps
Preferred start timeframe:
Within 3 months
3-6 months
6-12 months
Research stage only
How did you hear about Aspen Eco Power?
SEAI Website
Friend / Family
Online Search
social media
Other
Type a question
Customer ID
Submit
Should be Empty: