Morgan State Science Center 
  • Interested Bidders

    The seven-story, 246,000 SF building will house the School of Computer, Mathematical, and Natural Sciences, uniting the university’s Biology and Chemistry departments under one roof. Designed for the 21st-century learning and innovation, the facility will have plenty of advanced research labs, IT spaces, collaboration zones, and a botanical greenhouse.  Moody Nolan, the country's largest African American-owned architecture firm, designed the Science Center as more than just an average university facility. The building will pursue LEED Gold certification and include sustainable features such as a green roof and grey water reclamation systems, aligning innovation with environmental responsibility. This transformational project stands not only as the largest state investment in the university’s history but as a legacy of innovation, equity, and visionary leadership.
  • Key Things to Note:

    To be invited as a prime bidder, you must at a minimum, meet the following: 1) You MUST be prequalified and your prequalification limit MUST meet the minimum bonding capacity identified for the specific category. 2) If you are a joint venture, all firms named in the joint venture must be prequalified. 3) You MUST be registered by completing this form.
  • All Prime Bidders are required to prequalify

    https://www.bartonmalow.com/subcontractors/
  • Should be Empty: