PLANNING: PERMIT APPLICATION
  • PERMIT APPLICATION

  • PROJECT INFORMATION

  • Rows
  • Rows
  • Temporary Power Responsibility:

    The General Contractor and the Electrical hereby assume all responsibility for any use of electrical power at this building site until the project has received its Certificate of Occupancy.

    This Temporary Conditional Electric Service is being granted as a convenience for the Contractor/Permit Holder. Violation, such as any unapproved occupancy or use of power for other purposes than being requested, will be considered sufficient cause for the power to be terminated, as well as denial of future requests for Temporary Power by the Contractor/Permit Holder. The City of Tucker also reserves the right to have the temporary power removed at any time it feels that the safety of workers or any other persons may be in danger due to the Temporary Electrical Power.

  • PROPERTY OWNERS INFORMATION

  • Format: (000) 000-0000.
  • APPLICANTS INFORMATION

  • Format: (000) 000-0000.
  • CONTRACTORS INFORMATION

  • Format: (000) 000-0000.
  • COMMERCE BUILDING FEES

  • Calculating Building Valuation

  • Unless otherwise stated, the valuation of new commercial or industrial construction will be based on the actual contract cost of the work, or calculated by using the latest construction cost data as published in the Building Safety Journal by the International Code Council (ICC). For interior completion only, the construction cost is valued at fifty percent (50%) of the calculated ICC building valuation.


    Fees are collected prior to issuance of permits.

  • Fee Payment

  • Plan Review Fees

  • New single-family residential review = Additional 50% of permit fee
    Residential renovations/additions = Additional 50% of permit fee
    All commercial/industrial individual plan reviews = Additional 50% of permit fee

  • Residential Building Fees

  • Heated square feet  = $ 0.20
    Unheated square feet  = $ 0.12

  • COMMERCE BUILDING FEES

    Permit Fee Table Total Contract Valuation Fee
    Permit Fee Table $1,000 and less Minimum fee of $100
    Permit Fee Table $1,001 to $50,000 $15.00 for first $1,000 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000; minimum fee of $100
    Permit Fee Table $50,001 to $100,000 $260.00 for first $50,000 plus $4.00 for each additional thousand or fraction thereof, to and including $100,000
    Permit Fee Table $100,001 to $500,000 $460.00 for first $100,000 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000
    Permit Fee Table $500,001 and up $1,660 for first $500,000 plus $2.00 for each additional thousand or fraction thereof.
    Trade Permits (Residential, Commercial, and Industrial) Permit Fee Use permit fee table- minimum $100.00
    Certificate of Occupancy or Completion (C/O or C/C) New single-family detached, condo, or townhome $100.00
    Certificate of Occupancy or Completion (C/O or C/C) New commercial $250.00
    Certificate of Occupancy or Completion (C/O or C/C) New industrial $500.00
    Certificate of Occupancy or Completion (C/O or C/C) New or renovated commercial tenant space $200.00
    Land Disturbance Permit (LDP) Issued for 1 acre or more of disturbance $80.00 per acre ($40.00 paid to Environmental Protection Division, $40.00 paid to City of Commerce)
    Mobile Homes Permits $250.00
    Mobile Homes Installers $100.00
    Mobile Homes CO $150.00
    Mobile Homes Existing Site Inspection $100.00
    Mobile Homes Moving Site Built Homes $150.00
    Mobile Homes Inspection Mileage by Mile $0.50
    Demolition Residential $150.00
    Demolition Commercial $300.00
    Signs Commercial/Industrial $100.00
    Signs Canopy/Awning $50.00
    Other Swimming Pools $250.00
    Other Deck/Porch $0.12 per square foot
    Other Sheds/Accessory Buildings $0.20 per square foot (heated)/ $0.12 per square foot (unheated)
    Other Alterations $0.10 per square foot (heated)/ $0.06 per square foot (unheated)
    Temporary Electric Service Temporary Pole $50.00
    Underground Storage Tanks 0-500 Gallons $50.00
    Underground Storage Tanks 501-8,000 Gallons $100.00
    Underground Storage Tanks 8,001-20,000 Gallons $150.00
    Underground Storage Tanks Over 20,001 $200.00
    Flammable Liquid Pump Permit Fee $20.00
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Note: Only the Property Owner, Architect, Engineer, or General Contractor should sign this application.

    EXCEPTION: An Authorized Agent may also sign, when an Authorized Permit Agent Form is completed on behalf of a State of Georgia licensed contractor. Before signing, please carefully read the statements below.

    I do solemnly swear that the information on this application is true, and that no false or misleading statement is submitted herein to obtain a Building Permit or Certificate of Occupancy. I understand that if I provide false or misleading information in this application I may be subject to criminal prosecution and/or immediate revocation of any Building Permit or Certificate of Occupancy issued as a result of this application. I understand that I must comply with all City ordinances and regulations. I hereby agree to provide any clearance(s) and/or inspection report(s) required prior to the issuance of a Building Permit of Certificate of Occupancy.

    I agree to exonerate, indemnify and save harmless the City from and against all claims or actions, and all expenses incidental to the defense of any such claims, litigation, and actions, based upon or arising out of damage or injury (including death) to persons or property caused by or sustained in connection with any work performed under the Building Permit issued as a result of this application.

  • Clear
  • Should be Empty: