Good housekeeping practices for Erosion and Sediment Control will be followed.
• Surrounding vegetation and trees needs to be protected.
• Cease earth moving activities during heavy rainfall and runoff events
• Any tracking onto the road to be cleaned daily and ensure traffic travels along pre-defined routes.
• Dewatering- The discharge of water containing clay, silt, sand or any other deleterious material into the storm infrastructure shall be prohibited without the proper approvals.
• LBCO will inspect (every 7 days) or after significant weather events (>12.5mm precipitation in
24 hour period) and maintain erosion and sediment controls.
• The disturbed vegetated areas will be re-seeded with Hydroseed/mulch as soon as possible with approved species