LBCO Work Site Updates
Language
  • English (Canada)
  • French (Canada)
  • LBCO Work Site Information

  • Use this form to provide information for adding or modifying work sites within the BVS Digital Safety App.

    The first few sections are site specific, then there is some info that is company specific and not changed for each site.

    If fields are left blank or NA, these will not be shown in the App.

  • Work Site Changes Required*
  • Is this an urgent change?*
  • New Work Sites will be added immediately and be available within the App when you submit. 

    Changes marked as urgent: every attempt will be made to action these within 2 business days. There may be charges for urgent updates.

    Changes marked as NON urgent will be updated within 3 business days of the cut off date the 15th of each month. One hour of updates is included with premium subscriptions.

  • Site Specific Information

  • Modify the text for each section below. Add details as required. Mark fields with NA if not applicable or leave default text as is, if you would like that exact text to display the same way within that section of your safety app. 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Environmental (pick all that apply)
  • Good housekeeping practices for Erosion and Sediment Control will be followed.

    • Surrounding vegetation and trees needs to be protected.

    • Cease earth moving activities during heavy rainfall and runoff events

    • Any tracking onto the road to be cleaned daily and ensure traffic travels along pre-defined routes.

    • Dewatering- The discharge of water containing clay, silt, sand or any other deleterious material into the storm infrastructure shall be prohibited without the proper approvals.

    • LBCO will inspect (every 7 days) or after significant weather events (>12.5mm precipitation in

    24 hour period) and maintain erosion and sediment controls.

    • The disturbed vegetated areas will be re-seeded with Hydroseed/mulch as soon as possible with approved species

  • Site Facilities

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • By signing here, you acknowledge you above site orientation information to be correct.

  • I confirm the above work site can now be deleted from the App.

  • Should be Empty: