You can always press Enter⏎ to continue
Fee in Lieu of Sidewalk Construction & Sidewalk Modification Request

Fee in Lieu of Sidewalk Construction & Sidewalk Modification Request

35Questions
  • 1

    Contact Information

    For any questions about sidewalk requirements or difficulties completing this application, contact the Sidewalk & Pedestrian Realm team in the Planning & Development Department at (832) 394-8849 or at pd.sidewalkandrealm@houstontx.gov.

    Press
    Enter
  • 2

    Disclaimers

    The Sidewalk Committee is composed of the Planning & Development Department, the Office of the City Engineer (OCE), and the Mayor’s Office for People with Disabilities (MOPD).

    The Committee will evaluate a complete application for requesting a fee in lieu of sidewalk construction or sidewalk modification as authorized under § 40-558.

    Committee approval of any request requires documentation illustrating that § 40-559(b), § 40-559(e), or § 40-561(d) applies to a building permit.

     

    Staff advises applicants to complete and submit this form immediately after receiving a project number, allowing time to coordinate for the sidewalk construction if the Committee denies a request.

    This form requires correct and complete information.

    Failure to supply accurate information may result in application delay and eventual discarding.

    The applicant will need to submit a new application, and staff will process it as a new item in the order of receipt.

     

    Changes to the sidewalk plan during permitting or future projects on the same site may require a new application.

    Any sidewalk modification approval is subject to field inspections, additional requirements by OCE during permitting, and must comply with ADA requirements.

     

    If approved by the Committee, the Fee in Lieu of Sidewalk Construction is $12 per total square footage of the required sidewalk.

    Staff will inform the applicant of the fee amount after verifying all the information.

    The applicant consents to pay this fee by submitting this form.

     

    Granting a request does not set a precedent, and the Committee reviews each case on its own merits.

    A complete application does not guarantee approval by the Sidewalk Committee for a request for a fee in lieu of sidewalk construction or a sidewalk modification.

    Press
    Enter
  • 3
    You must read and acknowledge the disclaimers to continue this form and your request be processed.
    Press
    Enter
  • 4
    Use one application per project type.
    Press
    Enter
  • 5
    Provide the BCE (Building Code Enforcement) project number. Water/Wastewater application numbers are not valid for this form. You will need to apply for a project number to complete this application. Contact the Permits Office at the Houston Permitting Center to obtain one. (832) 394-8899 permits_office@houstontx.gov If you have multiple project numbers for sites adjacent to each other, provide one project number. If you have a master project, provide the main project number.
    Press
    Enter
  • 6
    Provide the ID prefix (WBS, CSJ, etc.) and the project number.
    Press
    Enter
  • 7
    Follow this address format: 1000 Washington Ave 77002
    Press
    Enter
  • 8
    Such as a Homeowner's Association (HOA), Architectural Committee, or similar.
    Press
    Enter
  • 9
    Press
    Enter
  • 10
    Press
    Enter
  • 11
    If you have multiple public ROW frontages, answer only for the first one in this section. Private streets or Type 2 permanent access easements do not need to follow sidewalk standards and are not regulated by the City of Houston. Format: Washington Ave, North Fwy, W 34th St, W Sam Houston Pkwy S
    Press
    Enter
  • 12
    Note: Reducing the safety buffer width is the only option with no application fee. Note: If approved by the Committee, the Fee in Lieu of Sidewalk Construction is $12 per total square footage of the required sidewalk.
    Press
    Enter
  • 13
    Press
    Enter
  • 14
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 15
    Private streets or Type 2 permanent access easements do not need to follow sidewalk standards and are not regulated by the City of Houston. Format: Washington Ave, North Fwy, W 34th St, W Sam Houston Pkwy S
    Press
    Enter
  • 16
    Note: Reducing the safety buffer width is the only option with no application fee. Note: If approved by the Committee, the Fee in Lieu of Sidewalk Construction is $12 per total square footage of the required sidewalk.
    Press
    Enter
  • 17
    Press
    Enter
  • 18
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 19
    Private streets or Type 2 permanent access easements do not need to follow sidewalk standards and are not regulated by the City of Houston. Format: Washington Ave, North Fwy, W 34th St, W Sam Houston Pkwy S
    Press
    Enter
  • 20
    Note: Reducing the safety buffer width is the only option with no application fee. Note: If approved by the Committee, the Fee in Lieu of Sidewalk Construction is $12 per total square footage of the required sidewalk.
    Press
    Enter
  • 21
    Press
    Enter
  • 22
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 23
    Private streets or Type 2 permanent access easements do not need to follow sidewalk standards and are not regulated by the City of Houston. Format: Washington Ave, North Fwy, W 34th St, W Sam Houston Pkwy S
    Press
    Enter
  • 24
    Note: Reducing the safety buffer width is the only option with no application fee. Note: If approved by the Committee, the Fee in Lieu of Sidewalk Construction is $12 per total square footage of the required sidewalk.
    Press
    Enter
  • 25
    Press
    Enter
  • 26
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 27
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • 28
    Press
    Enter
  • 29
    Press
    Enter
  • 30
    If you have an extension, provide the main line. You can enter the extension at the next question.
    Press
    Enter
  • 31
    Press
    Enter
  • 32
    Provide a sidewalk plan, sidewalk exhibit, or site plan that matches the requests you are seeking. The plan must contain the right-of-way conditions of all obstructions to architectural or engineering scale. Dimension the distance between the property lines to the roadway edge or back-of-curb. For fee-in-lieu requests, the plan must not contain a sidewalk. For modification requests, the plan must contain dimensions for the proposed sidewalk and buffer at all points not meeting the standard requirements.
    Drag and drop files here
    Select files to upload
    Max. file size: 4.9MB
    Cancelof
    Press
    Enter
  • 33
    Provide a legible and complete copy of a survey sealed and certified by a Texas registered professional land surveyor. The survey does not have to be recent so long as it illustrates all contiguous property under one ownership or common control.
    Drag and drop files here
    Select files to upload
    Max. file size: 4.9MB
    Cancelof
    Press
    Enter
  • 34
    Uploading one is recommended if you have a ROW dedication or if it is a newer plat.
    Drag and drop files here
    Select files to upload
    Max. file size: 4.9MB
    Cancelof
    Press
    Enter
  • 35
    • Huge
    • Large
    • Normal
    • Small
    Ok
    quoteCreated with Sketch.
    Ok
    Press
    Enter
  • Should be Empty:
Fee in Lieu of Sidewalk Construction & Sidewalk Modification Request
[Edit]
Question Label
1 of 35See AllGo Back
close