Smart PDF Form
  • Non-Critical Daily Lift Plan

  • Part A: Schedule of "Routine" Lifts

  • Rows
  • *** All lifts shall have a lift plan completed prior to performing any lifts. A new plan should be completed every day to assess current conditions and inspection of all rigging hardware and attachments. If a tandem lift (two or more pieces of equipment) is to be performed or the lift is over 75% of the equipment's rated capacity, contact the Safety Department for completion of a Critical Lift Plan. ***
  • Part B: Type of Equipment

  • Lifting Capacity

  • Part C: Rigging Configuration

  • Part D: Pre Lift-Checklist

  • Rows
  • Part E: Plan Review

  • Rows
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  • Should be Empty: