Stakeholder Feedback: Medium- and Heavy-Duty Vehicle Hubs Program and Secondary Corridor Charging Program
MassCEC and DEP are seeking feedback from interested stakeholders to help determine potential locations for strategically sited, publicly-available level 2 and level 3 charging hubs serving MHDV fleets. This form is separated into questions about sites that would be appropriate for MHDV Charging Hubs and Secondary Charging Corridors.
General Questions
Name
*
First Name
Last Name
Email
*
example@example.com
Organization
*
Please select the category that best describes your affiliation:
*
Medium- or heavy-duty vehicle fleet owner or operator
Charging station manufacturer, charge point operator, or installer
Real estate developer or property owner
Utility
Consultant
Other
If Other, please describe:
Would you like to receive additional information about these programs once available?
*
Yes
No
Back
Next
Medium and Heavy Duty Vehicle ("MHDV") Charging Hubs
Charging hub sites recommended under this Program will be prioritized in areas with MHDV traffic and domicile locations to enable electrification for smaller fleets that may otherwise not be able to electrify. Sites located in these census tracts will be prioritized for MHDV Charging Hubs: https://www.masscec.com/sites/default/files/documents/Charging_Hub_Census_Tracts_Data_0.xlsx. If a section is not relevant to your affiliation, please leave it blank or select "not applicable."
1. Do you have a suggestion for a MHDV fleet(s) domiciled in Massachusetts that we should consider for participation in this program?
Yes
No
If yes, please list the name of the fleet, the fleet domicile address(es), and contact information (name/email/phone number), if known.
If yes, are you directly affiliated with this/these fleet(s)? If so, how?
2. Do you have a recommendation for an ideal location(s) to site an MHDV charging hub?
Yes
No
If yes, please list the site location(s) and the reason(s) why you think it is ideal.
3. If you are a real estate developer or property owner, do you currently own or operate a location(s) that could host an MHDV charging hub?
Yes
No
Not applicable
If yes, what is the address of the site(s)?
From the site(s) above, please list any that currently have a pending Make Ready request.
From the site(s) above, please list any that previously had a Make Ready request.
4. If you are a charging manufacturer, charge point operator, or charging station installer, do you currently have any sites identified as ideal locations for an MHDV charging hub?
Yes
No
Not applicable
If yes, what is the address of the site(s)?
From the site(s) above, please list any that currently have a pending Make Ready request.
From the site(s) above, please list any that previously had a Make Ready request.
Back
Next
Secondary Corridor Charging Hubs
Charging Hub sites recommended under this Program are intended to to fill the gaps along secondary corridors that enable travel along those roads, and are also accessible for people who live nearby. Sites located in these census tracts will be prioritized for Secondary Corridor Charging Hubs: https://www.masscec.com/sites/default/files/documents/Secondary%20Corridor%20Charging%20Hubs%20Results.xlsx. If a section is not relevant to your affiliation, please leave it blank or select "not applicable."
1. Do you have a recommendation for an ideal location(s) for a direct current fast charge (DCFC) charging hub in one of the census tracts identified above?
Yes
No
If yes, please list the site location(s) and the reason(s) why you think it is ideal
2. If you are a real estate developer or property owner, do you currently have any sites identified as ideal locations for DCFC charging hubs in one of the census tracts identified above?
Yes
No
Not applicable
If yes, what is the address of the site(s)?
From the site(s) above, please list any that currently have a pending Make Ready request.
From the site(s) above, please list any that previously had a Make Ready request.
3. If you are a charging manufacturer, charge point operator, or charging installer, do you currently have any sites identified as ideal locations for DCFC charging hubs in one of the census tracts identified above?
Yes
No
Not applicable
If yes, what is the address of the site(s)?
From the site(s) above, please list any that currently have a pending Make Ready request.
From the site(s) above, please list any that previously had a Make Ready request.
Submit
Should be Empty: