New Service Connection
Application for New Customer Connection
Personal Data
Full Name
Phone No
Phone Number
Please enter a valid phone number.
Format: (000) 000-0000.
Phone Number
Please enter a valid phone number.
Format: 0000 000 0000.
Valid Email Address
*
Date of Birth
/
Day
/
Month
Year
Nationality
Nigerian
Non-Nigerian
Nationality for Non-Nigerian
Back
Next
Section 2 — Premise details
Connection site
Detailed Address(where supply is required)
Landmark
State/Region
*
Adamawa
Borno
Taraba
Yobe
Business Unit- Adamawa
Gombi
Jada - AL- Mushtari Feeling Station
Jambutu- Airport Area, Faro, Demsawo, Gotel, Zone 3, Fombina etc
Jimeta- Police Round About, Mubi Round About,
Michika - Science School Uba, Askira Road, FGC Lassa
Mubi - Maiha Road, Sabon Layi, Gidan Madara, Anguwan Kara, Blue House
Numan
Yelwa - Yola South, AUN etc
Test-Area
Business Unit - Borno
Biu - Stadium, Kinging, Wandali, Wuyo, Sabon Kasuwa, Dugja Area, Nasarawa, Terminus Park
Bulumkutu- Marker Square Supermarkt, Teachers Quarters, Living Faith
Kanem- New GRA, Old Maiduguri, Bama Road, 202, Kachallari, NUJ, London Ciki, Kasuwan wake, 303, Kaleri, Muna etc.
Yerwa- Monday Market, Post Office, Shehuri North/South, Damboa Road, Ahmadu Bello way, Fizzan etc
Business Unit - Taraba
Jalingo 1- Mile Six, Behind Stadium, Mechanic Village, TSTC, Technobat, CBN Area, BabaYau, Runde Abuja Phase1/2, Shagari Phase1/2, Road Safety Area, Jauro Yunu Grace Junior.
Jalingo 2
Wukari- Ibbi, Takun
Business Unit - Yobe
Damaturu
Nguru
Potiskum - Sunshine FM, Prisons, Signal Barracks, Dogon Karfe, Emir Fika Palace
Selected BU
Type of Premise
*
2 Bedroom Flat
3 Bedroom Flat
Shop/Boys Qtrs
Duplex
Single Room
Block of Flat
Other
Use of Premise
*
Residential
School
Commercial
Church
Mosque
Other
Select Meter Provider
*
Technovati - Single Phase (N148,500.50)
Technovati - Three Phase (N226,000.48)
Back
Next
Section 3 — Document declaration
Upload instructions
Valid Means of Identification
*
Driver's License
International Passport
Permanent Voter's Card
NIN
Identification No (International passport, Driver’s License, PVC)
*
File Upload- Valid ID. (PDF/JPEG)
Browse Files
Drag and drop files here
Choose a file
Cancel
of
File Upload- Completed Electrical Inspection Form
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Select your certified electrician(Adamawa & Taraba)
Please Select
Abdulmuminu Salihu Jalo (Engr.) - A000777
Adamu M Babangida - A00475
Ahmed Ishaku - D1015
Asau Engineerin Services - 0002581
Bameri Ishaku - 00115
Bello Suleiman - DO2787
El-Haske Global Resources - 00937
Faisal Umar - DO1265
Ijarafu Gamdo - IGBOO184
Ijeyi Business Investment Limited - 03357
Joseph Omafu Inyala - DO 1268
Kwaji Tari Kwaya (Engr.) - A00590
Madu Ken - D0324
Patrick Paul Iya - B00395
Patrick Peter (Engr.) - A000123
Peter N Ojiakor - D01267
Spinos Global Resources Ltd. - 00934
Suleiman Agidi Samaila - DO1326
Tony Ikwems Ltd - 00941
Yascoma Ltd - A000449
Yawurube Investment Company - 00953
To avoid rejection, make sure the electrician you select matches the one on your uploaded inspection form.
Select your certified electrician(Borno & Yobe)
Please Select
Abbas Yusuf - D01455
Abdullahi Mohammed Ahmad - D02425
Abdullahi Musa - D01630
Abubakar Ali - B00367
Abubakar Bello Isa - D01507
Abubakar Mustapha - DD1466
Abubakar Mustapha Abdullahi - A01092
Adam Audu - D03019
Adam Hassan - C01366
Adamu Abubakar - A02013
Adewmmi Mark - D00107
Al-Muqaddim Engineering Ltd - CC/CEIF/PR/07933
Ali A Umar - D01471
Ali Alh Lawan - D01470
Ali Ibrahim Ali - D01474
Ali Inusa - D04107
Ali Suleh Mohammed - D04103
Alkali Abba Tijani - A00570
Ashiru Abdulrahim - DO1464
Awali Hassan - D01473
Baba Gana M. Fulata - A01968
Babagana Lawan - D02883
Babagana Mustapha - A01118
Babagana Mustapha Ngala - A01369
Babagana Mustapha Usman - A01122
Babakura Kaumi - A01969
Bashir M Ibrahim - D04563
Benjamin Eneje - D00105
Bintu Tijjani Maina - A01091
Buba Mwajiri - C02025
Bukar Goni Modu Kwanduga - D00501
Bukar Mallam Bawa - D02747
Bukar Salihu - D01465
Bukar Yarima Bama - A01119
Dahiru Salisu - D01461
Dauda Adamu - D02744
Dominic Neigeshe Aondo - A00568
Emmenuel Olukosi - D00108
Garba Alhasan - D01464
Goni Mohammed - D02861
Habu Mohammed - A01123
Hamid Umar Husaini - D01469
Hamidu Salisu - D01460
Haruna Umar - A01083
Hassan Alhaji Bello - A01143
Hassan Mohammed - D02696
Henry Sunday - D00103
Ibrahim Abubakar Hamid - D02424
Ibrahim Baba - A00569
Ibrahim Bello Suleiman - A02017
Ibrahim M Ali - D01463
Ibrahim M Yusuf - A01948
Ibrahim Mohammed - D01472
Ibrahim Musa - D03018
Ibrahim Mwad Ndirmbulah - A01087
Ibrahim Shuaib - A02137
Idris Garba - A00704
Idris Shaibu - A01120
Ijaduwa James - A02014
Isa Mohammed Lawan - D02884
Ishaku Yakubu Wakili - D01475
Ismaila Umar - B00207
Jacob Taru - A01945
Jafaru Usman - A01090
Jams Tumba - D04561
Jiddum Jidda - A00703
John Pawl - D02951
Lawan Bukar - D02862
Lawan Garba Mohammed - D04106
M-Tech Solar Solution Engineering Co. Ltd - CC/CEIF/PR/00363
Micheal A Dara - D00104
Modu Ali Bukar - B00361
Modu Mohammed - A01085
Modu Mustapha - A01089
Mohammd Yunusa H. - A02018
Mohammed A Mohammed - D01467
Mohammed A. Dauda - A01947
Mohammed Al-Navazu - D01459
Mohammed Goni Adam - A01944
Mohammed Musa - AO1121
Mohammed Musa - D01458
Mohammed Saidu - CO1136
Mohammed Salisu Izge - D00106
Mohammed Shariff - A01394
Mohammed Usman - D04105
Mua'Zu Alh Ya'U - A01967
Mufi Renewable Energy Company - CC/CEIF/PR/00111
Muhammed Sabiu - D02746
Musa M Maina - D04562
Musa Umar Lawan - D04366
Mustapha M. Muhammad - A01971
Musty Global Power Co. Ltd - CC/CEIF/PR/08230
Nura Dini Sani - D02745
Olubunmi Kadiri - A02019
Othman Musa Yakubu - A01084
Pindal Saidu - D01801
Powerlec Engineering Ltd - CC/CEIF/PR/03889
Razolad Engineering Services Ltd - CC/CEIF/PR/03891
Salisu Alh Ali - D01468
Shatima Haruna Baba - A01946
Sule Abdullahi Amaza - A01368
Suleiman Alh Shehu - D03017
Tahir Alh Lawan - D01456
Tajudden A Ojo - D00500
Tawo Akintola - D01506
Umar Abubakar Wakta - A01087
Umar Adamu - A01970
Wazintu G25 Nig Ltd - CC/CEIF/PR/08231
Yahaya Mohammed Wasili - A01088
Yusuf A Mshlia - A01972
Yusuf Mohammed Pitti - CO1135
Zarib Investmtment Co. Ltd - CC/CEIF/PR/07926
To avoid rejection, make sure the electrician you select matches the one on your uploaded inspection form.
Back
Next
Section 4 — Declaration & consent
1. SYSTEM OF SUPPLY The Operator’s system is alternating Current at a frequency of 50Hertz. The low voltage will be either 230 volts single phase or 400 volts. 2. INSTALLATION Wiring installation shall be executed to the satisfaction of the Operator who will inspect and/or test installation. 3. SERVICE LINE The nature and location of service lines and other supply facilities shall be determined by the Operator. The Operator shall be at liberty at any time to take branch services off the service lines whether on the customer premises or not, for the purpose of supplying electricity to any other premises. The customer shall obtain all facilities required by the Operator for installation of the service line including the necessary Right of Way over his own and/or adjacent property which the Operator may require. Any service line or other facilities provided by or donated by the consumer shall be treated in line with the investment in networks Regulation by the Commission. 4. ACCESS TO PREMISES The customer shall give the Operator all reasonable and necessary access to the customer’s premises for the purpose of connecting, disconnecting, inspecting, testing, altering, replacing, maintaining or removing any service line, meter and/or other apparatus or any part thereto and for reading the meter. The Operator’s official will produce the Operator Identity Card, upon demand. The customers shall pay a fee for each special meter reading made on request. 5. ADDITIONAL EQUIPMENT After the installation referred to in schedule 2.1 hereof has been tested and passed by the Operator, the customer shall not have any additional equipment connected to his installation without submitting an application for electricity supply and agreement from to the Operator giving at least seven days’ notice of his intention to do so, and he shall not use such additional equipment until the installation has been re-tested and passed by the Operator. Neglect of this precaution may cause interruption of supply and damage to YEDC Equipment. A penalty may be imposed for default. 6. TESTING AND ACCURACY OF METERS Should the customer or the Operator give notice disputing the accuracy of a meter, such meter shall be tested by the Nigerian Electricity Management Services Agency (NEMSA). If the customer considers his meter inaccurate, his notice to that effect shall be accompanied by a deposit to cover the cost of the test, in the event of the meter having an error exceeding the line of error as may Three phase 11 be allowed by the regulation in force, the amount payable for electricity charge for the period for which the customer is charged on the last invoice rendered prior to the notice of dispute shall be determined in line with the provisions of NERC’s Regulation on Meter reading, Billing, Cash Collection and Credit Management. 7. DISCONTINUANCE OF SUPPLY Not less than seven days’ notice in writing must be given to the Operator by the Customer or landlord before vacating the premises. In default of such notice the Customer shall be liable to the Operator for all accounts arising until such notice is received or until the Operator accepts an application for the supply to the same installation from another Customer. The Operator reserves the right to discontinue supply of electricity for purposes of safety, when other customers are being connected or when the Operator’s mains or equipment are tested, repaired, or in case of unavoidable interruption due to fire, flood, tempest, accident and breakdown of machinery. 8. PAYMENT FOR ELECTRICITY SUPPLY From the date supply is made available, the customer must pay monthly for all electricity billed in accordance with the applicable rate. Official receipts are issued by the Operator for all payments made to it. Customers are advised on each occasion to check that the amount on their receipt corresponds with the sum paid. SPECIAL NOTE: Whenever any customer of electricity supplied by the Operator leaves the premises where such electricity has been supplied to him without paying the charges for electricity or meter rental due to him, the Operator shall be entitled to recover from the landlord in accordance with Clause 4.11. 9. RESPONSIBILITY FOR YEDC APPARATUS The Customer shall ensure the safety against damage or destruction by fire and shall be solely responsible for the safe custody of the meter and other apparatus belonging to the Operator that were installed at his premises and shall not damage, alter, remove the same or obliterate or remove any marks, word, or numbers thereon, or permit any such damage. The customer shall make good any such damage or reimburse the Operator to the extent of any loss the Operator may sustain by reason of any breach of these conditions and regulations. The customer shall give notice to the Operator of any breakdown, failure, loss, injury, or damage to the meter or any apparatus belonging to the Operator installed in his premises. 10. NON-LIABILITY OF OPERATOR The Operator will not be responsible for any loss or damage occasioned to any person or property whether belonging to the customer or not arising out of any defects in or accident to the wiring installation or by the use of electricity supplied or any apparatus that belongs to the Operator or through any default arising on the Operator’s system or for any cause beyond their control. This provision is subject to the Operator putting in place all safety measures to ensure a duty of care in the discharge of its responsibility to the customer. 12 11. THE IMPROPER USE OF SUPPLY If the customer makes use of the supply in such a way as to interfere with the general distribution of the electricity, immediate steps shall be taken to remedy the defect complained of or supply discontinued. 12. BREACH OF AGREEMENT If the customer shall neglect or refuse to pay the electricity supplied in accordance with these conditions and regulations, or become subject under the bankruptcy laws or enter into liquidation, or suffer execution to be made on his effects or commit any other breach of this agreement, the Operator may terminate this agreement and/or discontinue the supply of electricity and/or remove the apparatus belonging to them subject to the provisions of NERC’s regulation on connection and disconnection of electricity services. 13. REVISION OF CONDITIONS OF SUPPLY The Operator may from time to time, on giving notice to the customer in writing or by public notice amend or alter any of the above conditions of supply or their scale of charges and such amendments or alterations shall take effect from the date specified in the said notice as approved by NERC. 14. DISPUTE RESOLUTION The customer and the Operator also hereby agree to abide by and exhaust all administrative remedies as contained in the NERC Customer Complaint Handling and Procedures Regulations before resorting to any other dispute resolution or adjudicatory process.
Conditions and Regulations of Supply
I/We hereby request that Electricity will be supplied in accordance with the Electricity Power Sector Act 2005 of the Federal Government of Nigeria and all the relevant codes and Regulations as approved by the Nigeria Electricity Regulatory commission (NERC).
Supply Agreement
*
I / We, the undersigned owner/tenant/occupier of the premises stated in the Connection/Modification form agree with theCompany to take supply of Electrical energy at the mentioned premises to all the lamps, apparatus and motors installed notexceeding the maximum load stated in the form herein referred. In the event of any variation, I/We agree to notify theCompany in writing before implementation and in line with NERC Distribution Code Version 01 and YEDC guidelines or asmaybe amended from time to time.I / We hereby agree:1.Agree to execute the project with standard distribution material inspected and approve by YEDC Engineers beforethe commencement of the project.2.To engage the service of COREN contractor registered in line with NERC/YEDC requirement in the execution of theprojects.3.Agreed to subject the entire projects to full pre-commissioning test by federal ministry of power/YEDC Engineersbefore connection to the grid.4.To pay the electricity charges for such supply/loss of revenue in respect of modification.5.To comply fully with the conditions stated in the Connection/Modification form and any other condition that maybe required from time to time as contain in the NERC distribution code version 01.6.To allow Authorised YEDC personnel entry into the premises of supply for purposes of reading the meter, andinspecting the installation to ascertain that the same is in good working order.7.To avoid any kind of meter damage.8.To prevent meter tampering by unauthorised person(s).9.Failure of any circuit component, a part or the whole construction within the period of one year is the responsibilityof the user.10.That ownership of all overhead construction reverts to YEDC after commissioning.
Data consent
*
I consent to my information being used to process this application
Declaration
*
I/We (Applicant) confirm that the information given in above is true in it’s entirety and agree that if any part is found to be untrue the electricity supply may be disconnected.
Submit
Should be Empty: