• New Single Family Residential BuildingPermit Application

  •  - -
  • Property Owner

  • Format: (000) 000-0000.
  • General Contractor

  • Format: (000) 000-0000.
  • Plumbing Contractor

  • Format: (000) 000-0000.
  • Electrical Contractor

  • Format: (000) 000-0000.
  • HVAC /GasContractor

  • Format: (000) 000-0000.
  • Notice: No changes shall be made from that which is stated in this application, or in attached plans and specifications, except by submitting a revised application, plans and/or specifications and receiving approval of the Chief Building Official for such change. Granting of a permit shall not be construed as a permit for or an approval of any violation of the Building Code or any other state or local law regulating construction or the performance of construction. I hereby certify that I have read and examined this application and the information provided herein is true and correct. I further certify that all construction will comply with the International Building Codes.

  • Clear
  •  - -
  • FOR OFFICE USE ONLY

  • Residential Permit Application Checklist

    The following list of documentation is required before a permit will be issued for residential construction. Incomplete forms will not be processed and will delay permit issuance. Please return this form with all permit application submittals. All documents must be legible

    Completed building permit application

    Contractor licensing documentation (state license card, business license, driver’s license)

    Subcontractor licensing documentation (state license card, business license, driver’s license) GSWCC Level 1A certification (Blue Card)

    Two (2) sets of scaled construction drawings with dimensions (foundation plan and detail, floor plan of each level, elevations, and wall details) 1 copy on 8 ½“ x 11” for file

    House location plan: scaled lot drawing with a scaled footprint of house and any other structure located on property, show building limitations, setback requirements, and erosion sediment control.

    One (1) copy set of GSWCC approved ESC plans for initial, intermediate and final phases. (applicable for secondary and tertiary permit holders)

    Verification of 911 addressing

    Septic permit (if applicable)

    Completed water/sewer application (if applicable) Recorded deed of property

    Recorded plat of property

     

  •  - -
  • Should be Empty: