Safe Work Method Statement - C & M Coolrooms
  • Safe Work Method Statement - C & M Coolrooms

    office phone -(03)9401 3444
  • Date*
     / /
  • SWMS Approved by Mark Connelly

  • Equipment/PPE required for job:

    Safety Helmet, Saftey Boots, Hi-Vis clothing.
    When required: Gloves, Hearing protection, Safety glasses.

    Qualifications / Competence of personnel required to complete job safely:

    Trade qualifications as appropriate.
    Construction Induction Card.

    Legislation / Standards / Codes applicable:

    VIC OH&S Act 2004
    VIC OH&S Regs 2007 

     

  • Step 1 - Hazard Identification

  • Physical Hazards*
  • Mechanisms of Injury*
  • Controls required
  • Step 2 to 5

  • Image field 248
  • Image field 249
  • Image field 250
  • Image field 251
  • Procedure (Steps)

  • Procedure: Arival at Site and work area

  • Hazard:

    O H & S

  • Control Measure:

    • Discuss scope of works with management
    • Access and controls
    • Wear appropriate PPE
  • who is responsible
  • Hazard:

    Not Familiar with Site

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Pedestrians / Staff

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Forklifts/Pallet Jacks/ Trucks

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Procedure: Make safe and barricade work area

  • Hazard:

    Traffic / Pedestrians

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Procedure: Remove old door and frame

  • Relevant to Job
  • Hazard:

    Drilling

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Cutting / Grinding

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Heavy Lifting

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Sharp edges

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Bacteria

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Procedure: Cutting coolroom panel

  • Relevant to Job
  • Hazard:

    Noise

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Hazard:

    Panel saw

  • Control Measure:

    • Undertake site induction
    • Stay to designated walkways and roadways
  • who is responsible
  • Procedure: Door Repairs

  • Relevant to Job
  • Hazard:

    Grinding / Cutting

  • Control Measure:

    • Hot works Permit
    • Clean worksite
    • Safety Glasses
    • Hearing Protection (earmuffs)
    • Cut outside where possible
    • Fire Extinguisher
  • who is responsible
  • Hazard:

    Sharp Edges

  • Control Measure:

    • Wear Gloves
  • who is responsible
  • Hazard:

    Drill / Screw

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Hazard:

    Noise/Eye Damage

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Procedure: Install Stainless SteelFolds/Aluminiumsheets/coving

  • Relevant to Job
  • Hazard:

    Grinding / Cutting

  • Control Measure:

    • Hot works Permit
    • Clean worksite
    • Safety Glasses
    • Hearing Protection (earmuffs)
    • Cut outside where possible
    • Fire Extinguisher
  • who is responsible
  • Hazard:

    Sharp Edges

  • Control Measure:

    • Wear Gloves
  • who is responsible
  • Hazard:

    Drill / Screw

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Hazard:

    Noise/Eye Damage

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Procedure: EWP Operation

  • Relevant to Job
  • Hazard:

    Traffic -pedestrians/staff

  • Control Measure:

    • Separate EWP SWMS to be to be filled out
  • who is responsible
  • Procedure: Install New Doorframe

  • Relevant to Job
  • Hazard:

    Drilling

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Hazard:

    Sharp edges

  • Control Measure:

    • Wear Gloves
  • who is responsible
  • Procedure: Install New / Current Coolroom / Freezer Door

  • Relevant to Job
  • Hazard:

    Heavy Lift

  • Control Measure:

    • Consider two-man lift
    • correct lifting technique
  • who is responsible
  • Hazard:

    Ladder

  • Control Measure:

    • Use saftey step
    • Spotter
  • who is responsible
  • Procedure: Install Stops / Rollers

  • Relevant to Job
  • Hazard:

    Drilling

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Procedure: Bollards/Steel Angle

  • Relevant to Job
  • Hazard:

    Heavy Lifting

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs)
  • who is responsible
  • Hazard:

    Drilling Concrete

  • Control Measure:

    • Wear appropriate eye and hearing protection (safety glasses/earmuffs/dust mask)
  • who is responsible
  • Procedure: Completed Works

  • Hazard:

    Waste Materials

  • Control Measure:

    • Remove all waste - including any doors and parts
    • Re-instate work area to clean and tidy condition
  • who is responsible
  • Procedure: Exiting worksite

  • Hazard:

    Traffic

  • Control Measure:

    • Stay to designated walkways and roadways, obey all instructive signs, wear Hi-vis and correct PPE.
    • All documents completed and signed off by C & M Coolroom Services technician/s and store manager
  • who is responsible
  • Site Specific Hazards

  • Relevant to Job
  • who is responsible
  • who is responsible
  • Personal - Confirmation

    Confirmation of Review and Understanding of this SafeWork Method
  • Site contact

    Confirmation of SafeWork Method and contact details for sending digital pdf
  • Should be Empty: