• Kitchen Remodel Questionare

  • Thank you for considering 4 Edges Construction for your kitchen remodeling project!

    Every kitchen is different, and we'd like to learn a little more about your project. By answering a few questions about your project, you'll receive an instant preliminary budget range based on your kitchen size and renovation preferences.

    This questionnaire takes approximately 3–5 minutes to complete.

    Please note: The pricing provided is intended as a general budgeting guide only, not a formal estimate or proposal. Actual project costs will vary based on scope, materials, and existing conditions.

  • Format: (000) 000-0000.
  • PROJECT OVERVIEW

  • General Kitchen Remodeling Cost Guide (All-In Pricing per Square Foot)
    • Cosmetic Refresh: $150–$300 / sq. ft. (existing cabinets, refinishing, countertops, backsplash, flooring)
    • Good: $300–$450 / sq. ft. (new stock cabinets, standard finishes, minimal layout changes)
    • Better: $450–$650 / sq. ft. (semi-custom cabinets, upgraded finishes, custom touches)
    • Best: $650–$900+ / sq. ft. (custom cabinetry, luxury finishes, high-end features)

     

     

  • What level of kitchen renovation are you considering?*
  • Kitchen type
  • Where are you in the design process?*
  • Would you like help with design and layout?*
  • What is your ideal timeline for starting this project?*
  • Will you be living in the home during construction?
  • PROJECT SCOPE

  • What best describes your planned renovation?*
  • Cabinetry*
  • Countertop & Backsplash*
  • Appliances*
  • Appliance Quality
  • Flooring*
  • Sink & Faucet
  • Additional Features (check if desired)
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • OR
  • 📱Prefer to text your project photos?
    Text photos to (707) 448-7792
    Please include your name so we can match your photos to your questionnaire.

  • Your Preliminary Kitchen Remodeling Budget
    $ {finalLow} – $ {number47}

    This range is provided for budgeting purposes only and is not a formal estimate. Final pricing will depend on the project scope, material selections, and existing conditions.

  • What would you like to do next?
  • Should be Empty: