• Billboard Audit Checklist

    Billboard Audit Checklist
  • Audit Date
     - -
    2 digit day, 2 digit month, 4 digit year
  • PART 1: Structural Inspection

  • A: Footings & Primary Attachment Points

  • A1: Concrete Footing or Wall Condition
    Rows
  • A2: Base/Attachment Plate(s)
    Rows
  • A3: Hold-down/Anchor Bolts & Nuts
    Rows
  • A4: Grout & Sealant
    Rows
  • B: Structural Steelwork

  • B1: Main Columns or Posts
    Rows
  • B2: Headstock/Main Beam
    Rows
  • B3: Crossbeams
    Rows
  • B4: Uprights
    Rows
  • B5: Frames & Brackets
    Rows
  • B6: Structural Bolts & Fixings
    Rows
  • C: Cladding, Panels & Fixings

  • C1: Cladding
    Rows
  • C2: Panels
    Rows
  • PART 2: Safety Inspection

  • D: Fall Arrest & Safety Systems

  • D1: Vertical Lines
    Rows
  • D2: Horizontal Lines
    Rows
  • D3: Anchor Points
    Rows
  • E: Ladders, Walkways & Handrails

  • E1: Ladders
    Rows
  • E2: Lower Walkway
    Rows
  • E3: Upper Walkway
    Rows
  • E4: Handrails
    Rows
  • F: Crane/Lifting Device

  • F1: Powered Crane/Lifting Device
    Rows
  • PART 3: General Visual Inspection

  • G: Billboard Face

  • G1: Digital Display
    Rows
  • G2: Static Display
    Rows
  • G3. ID Branding Light Box/Panel
    Rows
  • H: Electrical

  • H1: Electrical Components
    Rows
  • I: Presentation

  • I1: : Paint, Presentation & Misc
    Rows
  • Overall Review
    Rows
  • Should be Empty: