Form-034 Crane Work Permit
  • Form-034 Crane Work Permit

    This form must be submitted at least 24 hours before work commences.
  • Are they SML Approved Contractor?*
  • Has operator completed SML Health & Safety Induction?*
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Image field 41
  • Image field 42
  • When setting up and using equipment at Seaview Marina we will make every effort to;

    • Operator & Rigger hold a current licence & competency.
    • Crew established a clear method of comms.
    • Crew discussed the task and reviewed the lift plan/Task analysis.
    • The area of the lifting operation been protected using barricades and/or spotters.
    • If the lift involves lifting personnel, is the an anti-block device installed and has it been tested immediately prior to the lift.
    • Pre/post start operational checks been completed.
    • Have the ground/structure conditions been assessed for bearing capacity and determined to be adequate.
    • The lift within the specific limits of the specific load charts for the configuration and radius.
    • Has all the lifting equipment been quarterly tested and tagged, are the tags all in date.
    • The load free of loose unsecured items.
    • The wind speed, weather (including lighting) and sufficient light been assessed and deemed within safe limits.
    • Consultation been undertaken with all affected parties.

     

  • Permit Required From*
     - -
  • Permit Required To*
     - -
  • Seaview Marina Ltd, Doc #: Form-034 Crane Work Permit, Version #: 1.1, Revised on #: 04/06/2026

  • Should be Empty: