Daily Crane Operation
Mobile Cranes, Personnel Baskets, and Rigging
Procedure HSEOP-03-04
WEEK ENDING:
CRANE DAILY PRE-OPERATION CHECKLIST
Daily
Unit #
Model #
Operator
Motor Meter Reading
Rows
Daily
Operator Comments
1. Oil levels - engine, transmission, hydraulic
Yes
No
2. Antifreeze (coolant), fan belts
Yes
No
3. Headlights, taillights, clearance/marker lights
Yes
No
4. Brake lights, revolving beacon light
Yes
No
5. Backup alarm, horn, windshield wipers
Yes
No
6. All glass clear / good condition
Yes
No
7. Swing brake, house lock
Yes
No
8. Boom angle indicator
Yes
No
9. Weight load indicator
Yes
No
10. Anti-two block device
Yes
No
11. All instrument gauges
Yes
No
12. Air pressure, low-air-pressure warning device
Yes
No
13. Air tanks drained
Yes
No
14. Parking brake, foot brakes
Yes
No
15. All controls for proper function
Yes
No
16. Outrigger pads, latches, outrigger float pads
Yes
No
17. Tire condition/pressure, wheel tread (or tracks)
Yes
No
18. Hoists (load, whip, or boom)
Yes
No
19. Boom and attachments
Yes
No
20. Hooks, load block, headache ball
Yes
No
21. Fuel
Yes
No
22. Fire extinguisher
Yes
No
23. Operator Manual, Log Book
Yes
No
24. Walk around inspection for:
Yes
No
Loose/missing bolts, pins / cotter pins
Yes
No
Leaking fluids, cracked/damaged hoses
Yes
No
Cracked welds, dents/damage
Yes
No
Frayed/damaged wire rope
Yes
No
Protective guards / shields in place
Yes
No
Rev. January 2021
Preview PDF
Submit
Should be Empty: