Delivery Drivers/ Vendors Site Orientation Checklist
Company:
*
Orientation Date
*
/
Year
/
Month
Day
Date
Project Name:
*
Project Number:
*
Visitor's Name:
*
General Trucking Activities Project Access Requirements: Check all boxes below
*
Working safely is a condition of access, and disciplinary actions are associated with failure to adhere to this or other project site requirements.
All drivers must follow and comply with all safety signage and regulations.
At no time will a driver be allowed to utilize a mobile phone while operating a vehicle / equipment.
You must stay with your truck at all times. For additional assistance please contact your point of contact or a PCL representative.
All incidents including near misses, injuries, incidents, equipment damage, property damage and or spills must be reported to PCL immediately regardless of severity.
In the event of an emergency you will hear 3 loud horns indicating you are to evacuate as safely as possible and go to your emergency muster / meeting point.
Driver / truck must be escorted while on site and during off load / loading.
Only unload in the designated area specified by your point of contact or by a PCL representative.
Prior to off loading, verify load hasn’t shifted and area is clear of workers.
Do not stand where material can shift onto you and don’t stand on materials when securing or strapping down material.
Stay clear of forklift or other equipment loading / off-loading.
Local legislative agencies require that any person entering a construction project must have the proper PPE listed below. These items are required 100%.
PPE Required 100% of the time. Check ALL below.
*
Hard Hat
Gloves
Safety Glasses
Class 2 Vest
Shirt with minimum 4" sleeves
Steel or Composite Toe Boots
Long Pants
ORIENTATION ACKNOWLEDGMENT
I do hereby for myself, my heirs, executors, administrators, successors and assigns release and forever discharge the PCL Family of Companies from any and all actions, causes of action, claims and demands for or by reason of any damage, loss, or injury to my person and or property which heretofore has been or hereafter may be sustained in consequences of my presence on the above referenced construction site.
Driver's Signature:
*
Facilitator's Signature:
*
Preview PDF
Submit
Submit
Should be Empty: