PCL HSE OPERATING PROCEDURESHot WorkProcedure HSEOP-10-02
Hot-Work Permit
Seek an alternative/safer method if possible!
This Hot-Work Permit is required for any operation that involves burning, welding, using an open flame, fire- or spark-producing tools, or that produces a source of ignition. This work includes, but is not limited to, welding, brazing, cutting, grinding, soldering, thawing pipe, torch-applied roofing, and chemical welding.
Date:
-
Month
-
Day
Year
Date
Company:
Time Started:
Hour Minutes
AM
PM
AM/PM Option
Time Completed:
Hour Minutes
AM
PM
AM/PM Option
Location/Building/Floor:
Work to be done:
THIS PERMIT IS GOOD FOR 24 HOURS
Available sprinklers, hose streams, and extinguishers are in service and operable.
*
Yes
N/A
Hot-work equipment is in good working condition in accordance with manufacturer's specifications.
*
Yes
N/A
Requirements within 35 ft. (11 m.) of hot work:
Flammable liquid, dust, lint, and oily deposits removed.
*
Yes
N/A
Explosive atmosphere in area is eliminated. LEL measured at <10%.
*
Yes
N/A
Floors swept clean and trash removed.
*
Yes
N/A
Combustible floors wet down or covered with damp sand or fire-resistive/noncombustible materials or equivalent.
*
Yes
N/A
Workers are protected from electrical shock when floors are wet.
*
Yes
N/A
Other combustible storage material removed or covered with listed or approved materials (welding pads, blankets, or curtains; fire-resistant tarpaulins), metal shields, or noncombustible materials.
*
Yes
N/A
All wall and floor openings covered.
*
Yes
N/A
Ducts and conveyors that might carry sparks to distant combustible material are covered, protected, or shut down.
*
Yes
N/A
Requirements for hot work on walls, ceilings, or roofs:
Construction is noncombustible and without combustible coverings or insulation.
*
Yes
N/A
Combustible material on other side of walls, ceilings, or roofs is moved away.
*
Yes
N/A
Requirements for hot work on enclosed equipment:
Enclosed equipment is cleaned of all combustibles.
*
Yes
N/A
Containers are purged of flammable liquid/vapor.
*
Yes
N/A
Pressurized vessels, piping, and equipment removed from service, isolated, and vented.
*
Yes
N/A
Requirements for hot-work fire watch and fire monitoring:
Fire watch is provided during and for a minimum of 30 min. after hot work, including break activity.
*
Yes
N/A
Fire watch is provided with suitable fire extinguishers and, where practical, a charged small hose.
*
Yes
N/A
Fire watch is trained in use of equipment and in sounding alarm.
*
Yes
N/A
Fire watch can be required in adjoining areas, above and below.
*
Yes
N/A
As per the PAI/fire watch, monitoring of hot-work area has been extended beyond 30 min.
*
Yes
No
N/A
(print) Supervisor Authorizing Hot Work Name
Supervisor Authorizing Hot Work Signature
(print) Permit-Authorizing Individual (PAI) Name
Permit-Authorizing Individual (PAI) Signature
(print) Fire Watch Name
Fire Watch Signature
I verify that the above location has been examined, the precautions marked on the checklist above have been taken, and permission is granted for this work.
Rev. January 2021
Page 1 of 1