• CORING PERMIT

  • Date*
     - -
  • Site Superintendent*
  • Work Site*
  • Company*
  • 1. Do you have permission from the site superintendent to core?*
  • 2. Does the area need to be scanned prior to coring?*
  • 3. Have you checked what is on the other side of the wall?*
  • 4. Has area been marked and tagged with a size?*
  • 5. Do either of the areas need to be barricaded off?*
  • 6. Does the floor on the other side need to be protected from a dropped core?*
  • 7. If you are using a 6” bit and cannot use the water management system how do plan to control the slurry?*
  • 8. Is additional water available on site?*
  • 9. Does the stand fit in the area that needs to be cored?*
  • 10. Is the surface the stand is mounted to flat enough to provide adequate suction?*
  • 11. If not do you have wedge anchors or a different anchor for the stand?*
  • PERMIT APPROVED?*
  • Site Superintendent Signature Date*
     - -