• Angel Oak Energy Residential Title 24 Project Intake

    Submit your residential Title 24 project details for review, and we’ll contact you if we need anything else.
  • Download the Plan Intake Checklist, fill it out if applicable, and include the completed PDF with your plans and supporting documents upload.
  • Project Basics

  • Target Permit Date*
     - -
    2 digit month, 2 digit day, 4 digit year
  • Primary Contact

  • Role*
  • Format: (000) 000-0000.
  • Existing & New Altered Features

  • Project Type*
  • Will improvements be made to the existing home?*
  • Which existing home components will be altered or upgraded?
  • Geometry and Plans

  • Fuel Type Available on Site*
  • Upload a File
    Drag and drop files here
    Choose a file
    Cancelof
  • Windows/Doors

  • Window and Door Schedule Checklist: Please confirm the uploaded plans include a complete window and door schedule with:*
  • Insulation & Construction Assemblies

  • Exterior Wall Insulation & Construction Assemblies

  • Applies to
  • Ceiling & Attic Insulation Construction Assemblies

  • Applies to
  • Roof Construction Assemblies

  • Applies to*
  • Will a Cool Roof or Radiant Barrier be Installed?*
  • Radiant Barrier & Cool Roofs

  • Is a CRRC-Rated Cool Roof Product proposed?
  • Radiant barrier
  • Mechanical-HVAC, DHW, Kitchen Hood & Ventilation Cooling

  • Solar/PV & Battery

    Only required For New Construction & Detached New Adu's
  • Notes

  • Before You Submit

    Please upload any available construction plans and supporting documents using the upload field above. PDF is preferred, and a window and door schedule is helpful if available.

    Don't have all the details yet? That's okay. Submit what you have, and we'll contact you if additional information is needed to prepare your quote. Uploads are optional for preliminary inquiries.

    Once submitted, you'll receive a confirmation email.

  •  
  • Should be Empty: