PREPARING AN ESTIMATE FOR KSEB
Check all the documents and wiring connections very carefully.
Name
*
Application Number
*
Contact number of consumer
*
Identity Proof
*
Did you get Ownership certificate from revenue athority?
*
Did you get Completion certificate from wireman?
*
Meter location picture link
Consumer's requirement power single phase or three phase?
*
Which type of tariff can suggest you?
*
Meter location Good or Bad ?
*
Is the wiring safe or not ?
*
Earth resistance Good or Bad ?
*
RCCB installed or not?
*
Are there any other electrical connection crossing?
*
Nearest consumer number is mandatory. ?
*
Is property crossing consent required?
*
Is it road crossing?
*
Is any other consent required?
*
Support wire shackle hook fixed or not
*
Weatherproof wire length ?
*
GPS Location
*
Proposed pole number
*
Transformer Name ?
*
New Insertion pole 2 line or 4 line ?
*
Number of stud pole
*
Single phase or three phase line or Cable ?
*
Number of proposed poles ?
*
Proposed Line Length
*
Number of proposed stay ?
*
📌 Remarks
*
Estimate Prepared by
Date
 /
Day
 /
Month
Year
2 digit day, 2 digit month, 4 digit year
Date
Hour Minutes
AM
PM
AM/PM Option
Submit
Should be Empty: