• Application Form

    Please complete in full for project registration.
  • Today’s Date*
     / /
    2 digit day, 2 digit month, 4 digit year
  • Format: 00000-000000.
  • Site Details

  • If an Agent is appointed to act on behalf of the Client, in signing this Contract, the Agent hereby acknowledges that it is the Agent's responsibility to provide a complete copy of this Contract to the Client and inform the Client of their obligations, duties and/or liabilities under and/or in connection with this Contract and by signing this Contract, the Agent binds the Client to the terms and conditions set out in this Contract.

  • Format: 00000-000000.
  • Note: Floor height in relation to project class is measured from the lowest external ground level adjacent to the building, up to the finished floor level of the highest occupied floor in the building not including floors exclusively containing plant.

    We cannot accept applications of Class 3H as these are HRB's and will need to go through the BSR. If you believe your project is an Independent Section to a HRB, please get in touch prior to submitting this form to confirm suitability.

  • Building Type*
  • Start Date (Start on site)*
     / /
    2 digit day, 2 digit month, 4 digit year
  • Commencement Date (Point at which works are 15% Completed)*
     / /
    2 digit day, 2 digit month, 4 digit year
  • Work is to be regarded as commenced when the sub-surface structure of the building or the extension including all foundations, basement levels (if any) and the structure of ground floor level is completed (typically up to DPC level)

    OR

    the client considers work amounts to 15% of the total proposed work. Notification of ‘commencement’ should be provided to the RBCA from the dutyholders.

  • Description of 'Commencement Works'*
  • Please select an option describing what you consider to be 15% of the total proposed works, known as 'initial work'.

    For example, an extension could be the foundations or DPC whilst a loft conversion could be steel installation. An estimate to the best of your knowledge will suffice.

    Select other to provide your own description.

  • Local Authority where the work / site is located - Find your local council - GOV.UK

  • Dutyholders

  • IMPORTANT NOTICE: Dutyholders including the principal designer and/or contractor will be legally required to provide a formal declaration of compliance at the end of the project. It is therefore essential that we are provided with their full contact details as soon as possible otherwise this may delay or prevent certification.

    If a principal designer and/or contractor is yet to be appointed, you can provide this at a later stage but it should be within 14 days of their appointment.

  • Format: 00000-000000.
  • Format: 00000-000000.
  • Fee's & Invoicing

  • Format: 00000-000000.
  • New Builds & Extensions

  • A site location plan at no less than 1:1250 MUST be submitted to Meadows & Turner Building Compliance Ltd showing the footprint of the new works (and for new buildings, also showing connections to the public sewers, or to septic tanks/treatment works).

     

    For ‘New Build’ dwellings or ‘New Buildings’ containing one or more dwellings (not including extensions to buildings, refurbishments or conversions), a 'Connectivity Plan' or suitable exemption statement should be submitted with this application in accordance with Part R of the Building Regulations 2010. Link: Approved Document Part R

  • Planning Approval

  • Do any of the following Optional Requirements apply:*
  • Signature

    When ready to proceed please complete, sign & submit the application form.
  • Please Select:*
  • By signing and submitting this form, you are confirming you have read and understood, and agree to our Terms & Conditions of Engagement.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: