You can always press Enter⏎ to continue
Do You Need a Cooling Tower Inspection?
Answer 10 quick questions about your cooling tower's condition, maintenance history, and planning needs to see whether it may be time for a professional inspection.
START
1
Step 1 Structural Integrity
*
This field is required.
Have you noticed any of the following?
Rust or corrosion
Cracked fiberglass
Wood deterioration
Water leaks
Not Sure
None
Previous
Next
Submit
Press
Enter
2
When was the last time the tower's structural condition was professionally evaluated?
*
This field is required.
Less than 1 year
1-3 years
More than 3 years
Never
Not Sure
Previous
Next
Submit
Press
Enter
3
Step 2: Mechanical Equipment
*
This field is required.
Have you experienced any of these?
Increased vibration
New or unusual noise
Gearbox oil leaks
Motor issues
None
Not Sure
Previous
Next
Submit
Press
Enter
4
Has your mechanical equipment been inspected in the last year?
*
This field is required.
Yes
No
Not Sure
Previous
Next
Submit
Press
Enter
5
Step 3: Water Distribution & Cooling Performance
*
This field is required.
Have you noticed any of the following?
Reduced cooling performance
Uneven water flow
Scaling or buildup
Damaged fill
None
Not Sure
Previous
Next
Submit
Press
Enter
6
Are you confident your tower is operating at peak performance?
*
This field is required.
Yes
Somewhat
No
Not Sure
Previous
Next
Submit
Press
Enter
7
Step 4: Safety & Access
*
This field is required.
Have you noticed any concerns with the following?
Ladders
Platforms
Guardrails
Walkways
Access hatches or doors
None
Not Sure
Previous
Next
Submit
Press
Enter
8
Can maintenance personnel safely access all critical areas?
*
This field is required.
Yes
Some areas are difficult to access
No
Not Sure
Previous
Next
Submit
Press
Enter
9
Step 5: Planning & Documentation
*
This field is required.
When was your last professional cooling tower inspection?
Within the last year
1-2 Years ago
More than 2 years ago
Never
Not Sure
Previous
Next
Submit
Press
Enter
10
How confident are you in next year's cooling tower maintenance budget?
*
This field is required.
Very confident
Somewhat confident
Not confident
We haven't planned yet
Previous
Next
Submit
Press
Enter
11
Calculation
*
This field is required.
Previous
Next
Submit
Press
Enter
12
Who Should We Send The Results To?
*
This field is required.
First Name
Last Name
Previous
Next
Submit
Press
Enter
13
See Your Results
*
This field is required.
Enter your name and email to receive your Cooling Tower Inspection Insights and recommended next step.
example@example.com
Previous
Next
Submit
Press
Enter
14
Please verify that you are human
*
This field is required.
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
14
See All
Go Back
Submit