EAWR Reg 4(3)
Test equipment must be suitable, in good condition, and proven effective before use. An unverified instrument must not be relied upon.
BS 7671 Part 6 — Inspection and Testing
All test instruments must be verified as functional before use. Results are only valid where the instrument has been proved on a known source.
IET Guidance Note 3 (GN3)
Instruments must be proved on a known live source before and after use. A dual-band NCV indicator operating at 12 V provides an early warning of voltage on protective conductors well below the 50 V safe threshold.
ENA Safety Bulletin SB PEN 01
Voltage appearing on earthing and bonding conductors is a strong indicator of PEN conductor failure. Any voltage on the main earth — even at low levels — must be treated as a dangerous condition requiring immediate DNO notification.
ENA G81 / ESQCR 2002
PME earth conductors carrying voltage indicate neutral imbalance or failure. Escalate to DNO immediately. Do not continue work until the supply has been confirmed safe.